Commencement notice group
Housing commencement notices — Booterstown
Booterstown, Dublin
1 unique commencement event · latest notified commencement 13 Jul 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 13 Jul 2026
- Latest notice
- 3,715 m²
- Planning references supplied
- D25A/0087/WEB
- Public location
- Booterstown, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Booterstown, Dublin
- County
- Dublin
Notice location variants
- ground floor level and green roof (approx CN0144771DR
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: works to St. Andrew’s College, which includes a Protected Structure (RPS 55) and will comprise of: 1) The demolition of the 1980s single storey extension known as House 5 (approx. 515 sqm) adjoining the protected structure to the north. 2) The removal of temporary accommodation comprising 5 no. sets of mobile classrooms. 3) The construction of a 4-storey learning centre as an extension to the school (max parapet height 35.550m) with teaching, administration, guidance and learning support accommodation, with forecourt, connected heat pump at ground floor level and green roof (approx.3720 sqm). 4) Realignment of the existing internal roads, paths and car parking layouts including additional set down areas and cycle parking (118 in total, 80 covered). 5) Addition of 5 no. EV charging docks to existing car parking numbers. 6) Creation of pocket parks and landscaped seating areas adjacent to hockey pitches and new learning building. 7) Reconfiguration of and improvements to Booterstown Avenue entrance. 8) Removal of gates and pillars at Booterstown Avenue and finishes to forecourts upgraded and pillars provided. 9) Removal of existing gates at Rosemount Terrace and erection of new vehicular and pedestrian gates, repositioned within the site for increased pedestrian safety, partial demolition of wall south of existing entrance. 10) All associated works including landscaping, access and infrastructure to facilitate development. A Natura Impact Statement has been prepared in respect of the proposed development.
Floor area stated for this source: 3,715 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.