← Complete commencement inventory

BCMS open-data feed

Change of use of a portion of the basement and ground floor and

Dublin, Dublin · Dublin

Source notice reference
SN0013842DC
Commencement date
2026-03-09
Planning reference
WEB2154/24
Planning authority
Dublin City Council
Project type
Change of use
Floor area
2671 m² · per notice; not summed
Indexed source check
2026-06-09T15:11:14Z

Public-safe works description

Change of use of a portion of the basement and ground floor and the entirety of upper floors (first to fifth floors but excluding the external portion of the fifth floor containing Eir equipment) from telephone exchange to hotel accommodation providing 92 bedrooms, linen rooms and stores as an extension to the ReZz D2 hotel, with reception accessed from Dame Lane. The development requires significant refurbishment and improvement works including internal and external alterations: Provision of staff facilities (shower, changing rooms and staff room) and plant room at basement level; Internal doorway opening at ground floor level between nos.5-6 Dame Court and nos.2-4 Dame Lane (REZz D2 Hotel) to link into Rezz D2 reception accessed from Dame Lane; Coffee kiosk and shopfront on Dame Court; Internal modifications at ground and 1st to 5th floors to provide 92 bedrooms, linen rooms and stores; Elevational upgrades and complete facade overhaul of the building to include revised elevational design and treatment of all elevations; Bike parking shelter within existing Eir car park to rear. All site and services works to facilitate the development.

This is one source-family notice identity, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.

Open grouped project and every phase · Open official source