Site start

Commercial site start — Dublin

Dublin

1 commencement notice · start date 09 Mar 2026 · planning reference given

Planning WEB2154/24 · Planning application

View full project timeline

Commencement notices
1
Latest start date
09 Mar 2026
Latest notice
2,671 m²
Planning reference
WEB2154/24
Location
Dublin

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • basement level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Change of use of a portion of the basement and ground floor and the entirety of upper floors (first to fifth floors but excluding the external portion of the fifth floor containing Eir equipment) from telephone exchange to hotel accommodation providing 92 bedrooms, linen rooms and stores as an extension to the ReZz D2 hotel, with reception accessed from Dame Lane. The development requires significant refurbishment and improvement works including internal and external alterations: Provision of staff facilities (shower, changing rooms and staff room) and plant room at basement level; Internal doorway opening at ground floor level between nos.5-6 Dame Court and nos.2-4 Dame Lane (REZz D2 Hotel) to link into Rezz D2 reception accessed from Dame Lane; Coffee kiosk and shopfront on Dame Court; Internal modifications at ground and 1st to 5th floors to provide 92 bedrooms, linen rooms and stores; Elevational upgrades and complete facade overhaul of the building to include revised elevational design and treatment of all elevations; Bike parking shelter within existing Eir car park to rear. All site and services works to facilitate the development.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,671 m².

Planning reference WEB2154/24

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.