The demolition of the existing lift core, boiler chimney
Dublin, Dublin · Dublin
- Source notice reference
- CN0137219DC
- Commencement date
- 2026-01-12
- Planning reference
- 4561/23
- Planning authority
- Dublin City Council
- Project type
- Material alteration
- Floor area
- 8595 m² · per notice; not summed
- Builder company
- Castle Build (IRL) Ltd
- Indexed source check
- 2026-06-09T15:11:14Z
Public-safe works description
The demolition of the existing lift core, boiler chimney, machine room and storage compartments located at the front Northeast elevation of the property and the demolition of a second lift core, external machine room on the Southwest elevation. Both lift cores are to be replaced with new construction comprising of new larger lift cores to the same height as the existing passenger lifts. The Northeast passenger lift will comprise of a glazed elevation facing Herbert Road and aluminum cladding to the external walls. In addition, a revised ground floor level entrance to the proposed new lift only. The Southwest passenger lift will comprise of a new, larger lift core. The proposal includes associated internal modifications, elevation changes and all associated site development works above and below ground.
This is one source-family notice identity, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.