Commencement notice group
Commercial commencement notices — Dublin
Dublin, Dublin
3 unique commencement events · latest notified commencement 09 Sep 2019 · planning basis not stated
- Unique commencement events
- 3
- Latest notified commencement
- 09 Sep 2019
- Latest notice
- 4 m²
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Public site labels seen across the notices
- One Molesworth Street, Dublin 2
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Installation of compartment wall to subdivide unit. Infill of existing opening in concrete floor slab at One Molesworth Street, Dublin 2
Floor area stated for this source: 4 m².
Construction of a sub-dividing wall to the 3rd floor of the building to create two separate tenancies at One Molesworth Street, Dublin 2.
Floor area stated for this source: 12,756 m².
Fitout works to Fourth Floor office at One Molesworth Street, Dublin 2 , to include the following deferred works detailed on Completion Certificate CCDC from Commencement Notice BCMS No:8369607: 1: Floor finish to ensure Part M compliance giving level access in the office floor plates. 2: Mechanical ventilation / air conditioning installation within office floor plates. 3: Switches, outlets and control units to ensure Part M compliance within the office floor plates. 4: Fire and Life safety systems, including emergency lighting within the office floor plates. 5: All artificial lighting throughout the office floor plates. The fit-out also includes the following additional works: Construction of reception area, meeting rooms, auditorium, kitchen, pantry, casual space, file room, wellness room, changing rooms, print rooms and store rooms. External works consist of: • Removal & replacement of 2 No. existing external fixed glazed façade panels with 2 No. sliding doors to south facing terrace. • External Plant to Roof Level Internal works consist of: • Raised Access Floor in the office floor plates and associated cavity barriers and dust sealer. • 4 No. Door threshold heights to south facing terrace. • Suspended ceilings and associated cavity barriers and dust sealer. • Metal stud wall partitions and associated cavity barriers. • Glazed wall partitions and associated cavity barriers • Mechanical ventilation / air conditioning installation within office floor plates • Water, Waste, Condensate, LPHW & CHW services within office floor plates • Switches, outlets and control units within the office floor plates. • Electrical cabling & links to landlord distribution board, FAP, MCC located in landlord riser to facilitate Mechanical controls & Electrical services to office floor. • Fire and Life safety systems, etc, including emergency lighting, heat and smoke detectors and break glass units within the office floor plates. • All artificial lighting throughout the offi
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.