Commencement notice group
Housing commencement notices — Galway
Galway, Galway
2 separate notices · latest notified commencement 21 Dec 2018 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 21 Dec 2018
- Latest notice
- 36,336 m²
- Planning references supplied
- ABP-301693-18
- Public location
- Galway, Galway
Public source geography
Site location
- Public site / locality
- Galway, Galway
- County
- Galway
Public site labels seen across the notices
- the junction of Thomas Hynes Road and upper Newcastle road in Dangan, Galway
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
It is proposed to construct new student accommodation scheme on the site of the Westwood Hotel located at the junction of Thomas Hynes Road and upper Newcastle road in Dangan, Galway. The development will consist of three separate buildings as follows:- Block A/B:- 5 storey building consisting of student accommodation/cluster apartments at each level with reception, staff, plant, recreation rooms and a café/restaurant at ground level. The building is separated in two blocks at ground and first floors to provide pedestrian and vehicular access to the site Block C:- 5 storey stand-alone building consisting of student accommodation/cluster apartments at each level with a gym and storage/plant facilities at ground floor. Block D/E:- 5 storey building consisting of student accommodation/cluster apartments at each level with plant rooms at ground level. The building is separated in two blocks at ground floor to provide pedestrian access to the site. The new development will be accessed from the N59, Upper Newcastle Road with a pedestrian entrance onto the Thomas Hynes Road.
36,336 m² · stated on this notice
Demolition of existing Hotel building and enabling works to facilitate the construction of Westwood student accommodation, Dangan, Galway
36,336 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.