Ballybrit Business Park on the east side of Galway City — commencement notices

Galway, Galway

1 separate notice · latest notified commencement 19 Apr 2021 · planning basis not stated

Source notices
1
Latest notified commencement
19 Apr 2021
Latest notice
5,318 m²
Planning references supplied
None stated
Public location
Galway, Galway

Public source geography

Site location

Public site / locality
Galway, Galway
County
Galway

Public site labels seen across the notices

  • Ballybrit Business Park on the east side of Galway City
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

SN0005948GY BCMS open-data feed

The project involves the phased subdivision of an existing large industrial facility at Ballybrit Business Park on the east side of Galway City. It is proposed to subdivide the existing building into 4 no. separate units/tenancies over 3 separate phases as follows: - Phase 1 – Unit 1 located along the entire west elevation of the building, currently occupied by Medtronic as their Global Services Building. As the unit is currently operational, it will be subject to a Regularisation FSC application . Phase 2 – Provision of 2 separate units (i.e. Units 2 & 3) along the southeast elevation of the building. Unit 2 will be occupied by DXC as a warehouse facility, while Unit 3 located to the east corner of the building will remain vacant in shell and core state. Phase 3 – Remaining area of the building (i.e. Unit 4), extending centrally towards the east elevation of the building. This unit will remain vacant in shell and core state.

5,318 m² · stated on this notice

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.