Commencement notice group
Commercial commencement notices — National Technology Park
Limerick, Limerick
2 unique commencement events · latest notified commencement 11 Apr 2018 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 11 Apr 2018
- Latest notice
- 1,303 m²
- Planning references supplied
- 15/180
- Public location
- Limerick, Limerick
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Limerick, Limerick
- County
- Limerick
Notice location variants
- National Technology Park, Limerick CN0037474LL
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of constructing Phase 6.2 of approved development granted under Planning Ref no 15/180. The construction of a new production hall with mezzanine plant space, a single storey loading bay, a new 3 storey office block and single storey canteen (total extended area building area 7,142m2) all to the north-west of the existing building; the expansion of the existing staff car park to provide 80 additional parking spaces; the construction of a new site entrance to internal roadway; the erection of a new boundary fence to extended site; hard and soft landscaping and all associated site works. Phase 6.2 consists of the construction of an additional bay to the existing production hall & mezzanine plant space. Total Area of development to be constructed is 1,303m2.
Floor area stated for this source: 1,303 m².
the construction of a new production hall with mezzanine plant space, a single storey loading bay, a new 3 storey office block and single storey canteen (total extended area building area 7,142m2) all to the north-west of the existing building; the expansion of the existing staff car park to provide 80 additional parking spaces; the construction of a new site entrance to internal roadway; the erection of a new boundary fence to extended site; hard and soft landscaping and all associated site works
Floor area stated for this source: 7,142 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.