Back to leads
Going to siteCurrent commencement

The development will consist of: the increase in width of the existing vehicular entrance to 3.5m; the provision of external insulation and replacement of existing windows; the provision of an external door on the gable elevation at ground floor level; hard and soft landscaping and all associated site development works above and below ground

Dublin / Dublin / Dublin, Dublin

Create alert Official file
Est. value Not listed
Units 1
Floor area 125 m²
Commenced 6 May 2025

Key facts

Lead summary

Commenced date
6 May 2025
Builder / developer
Woodwrap Construction Ltd
Planning permission
D24A/0975
Local authority
DĂșn-Laoghaire Rathdown County Council
Source reference
CN0128099DR
Units
1
Floor area
125 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The development will consist of: the increase in width of the existing vehicular entrance to 3.5m; the provision of external insulation and replacement of existing windows; the provision of an external door on the gable elevation at ground floor level; hard and soft landscaping and all associated site development works above and below ground

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert