New build
05 Oct 2026 · Latest notice
2 unique events
Bandon, Cork · Cork County Council · Planning ref 25/5148
The construction of a dwelling, site entrance, wastewater system, and all associated ancillary works.
Unique event Works stated Scale Commenced
CN0148137CC BCMS open-data feed
Construction of a detached domestic garage and associated ancillary works.
33 m²Builder not named
05 Oct 2026
CN0141234CC BCMS owner-supplied export
The construction of a dwelling, site entrance, wastewater system, and all associated ancillary works.
222 m²Builder named
04 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Other
30 Sep 2026 · Latest notice
2 unique events
Dundrum, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D25A/0045/WEB
Construction of a temporary ice rink and all associated ancillary site works located at the blue car park, Main St, Dundrum, Dublin 14
Unique event Works stated Scale Commenced
CN0148066DR BCMS open-data feed
Construction of a temporary ice rink and all associated ancillary site works located at the blue car park, Main St, Dundrum, Dublin 14
1,084 m²Builder not named
30 Sep 2026
CN0134470DR BCMS owner-supplied export
Construction of a temporary ice rink and all associated ancillary site works located at the blue car park, Main St, Dundrum, Dublin 14
Scale not statedBuilder named
15 Oct 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Sep 2026 · Latest notice
2 unique events
Townagh, Galway · Galway County Council · Planning ref 2560148
Construction of new dwelling house at Cloonrane, Ballindine and all ancillary site works
Unique event Works stated Scale Commenced
CN0147866GC BCMS open-data feed
The construction of a new garage at Cloonrane Ballindine, Galway and all ancillary site works
33.6 m²Builder not named
28 Sep 2026
CN0134610GC BCMS owner-supplied export
Construction of new dwelling house at Cloonrane, Ballindine and all ancillary site works
164 m²Builder named
17 Oct 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
25 Sep 2026 · Latest notice
2 unique events
Townagh, Galway · Galway County Council · Planning ref 2560583
Construction of a new building and all ancillary site works at Cloonrane Ballindine
Unique event Works stated Scale Commenced
CN0147846GC BCMS open-data feed
Construction of a new garage at Cloonrane bALLINDINE Galway
33.6 m²Builder not named
25 Sep 2026
CN0134634GC BCMS owner-supplied export
Construction of a new building and all ancillary site works at Cloonrane Ballindine
188.9 m²Builder named
20 Oct 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
23 Sep 2026 · Latest notice
3 unique events
Balgriffin, Dublin · Fingal County Council · Planning ref F25A/0663E
Construction of 38no. dwellings at Le Rondini Carrs Lane Balgriffin Dublin 17
Unique event Works stated Scale Commenced
SN0014859FL BCMS open-data feed
Construction of 1 No. Apartment Block, Consisting of 12 No. apartments at Le Rondini Carr's Lane Belcamp, Dublin 17
12 units · 1,177.8 m²Builder not named
23 Sep 2026
SN0014848FL BCMS open-data feed
Construction of 1 No. Apartment Block, Consisting of 10 No. apartments at Le Rondini Carr's Lane Balgriffin Dublin 17
10 units · 1,089.6 m²Builder not named
23 Sep 2026
CN0142251FL BCMS owner-supplied export
Construction of 38no. dwellings at Le Rondini Carrs Lane Balgriffin Dublin 17
38 units · 4,640 m²Builder named
13 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Sep 2026 · Latest notice
4 unique events
Rathdrum, Wicklow · Wicklow County Council · Planning ref 2560549
Construction of Phase 1 of a housing development including units 11, 12, 19, 20, 21, 22, 23
Unique event Works stated Scale Commenced
CN0148157WW BCMS open-data feed
Construction of 4 No dwelling houses (Units 3-6)
4 units · 428 m²Builder not named
21 Sep 2026
SN0014337WW BCMS open-data feed
Construction of Duplex Unit No 1 & 2
2 units · 118.5 m²Builder not named
17 Jun 2026
SN0014336WW BCMS open-data feed
Construction of Duplex Unit No 7 & 8
2 units · 118.5 m²Builder not named
17 Jun 2026
CN0142156WW BCMS owner-supplied export
Construction of Phase 1 of a housing development including units 11, 12, 19, 20, 21, 22, 23
7 units · 684 m²Builder named
05 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Sep 2026 · Latest notice
24 unique events
Douglas, Cork · Cork City Council · Planning ref ABP-307041-20
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
Unique event Works stated Scale Commenced
SN0014823CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block R, No's 01 & 02 The Lawns, Belview Wood. This is Phase 2c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
18 Sep 2026
CN0147372CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block Q, No's 42 & 43, The View, Belview Wood. This is Phase 2b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
16 Sep 2026
CN0120061CY BCMS open-data feed
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
121 units · 11,298.6 m²Builder not named
30 Sep 2024
SN0010228CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block N, No's 07, 08, 09 & 10, The Heights, Belview Wood. This is Phase 1Q of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010200CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block L, No's 01 & 02, The Heights, Belview Wood. This is Phase 1o of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010187CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block O, No's 11 & 12, The Heights, Belview Wood. This is Phase 1R of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010185CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block P, No's 22 & 23, The View, Belview Wood. This is Phase 1S of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010182CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block M, No's 03, 04, 05 & 06, The Heights, Belview Wood. This is Phase 1P of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010179CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block I, No's 36 & 37, The Green, Belview Wood. This is Phase 1L of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010174CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block J, No's 32 & 33, The Green, Belview Wood. This is Phase 1M of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010173CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block K, No's 20 & 21, The View, Belview Wood. This is Phase 1n of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010172CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block G, No's 18, 19, 20 & 21, The Green, Belview Wood. This is Phase 1J of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010171CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block F, No's 14, 15, 16 & 17, The Green, Belview Wood. This is Phase 1I of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010170CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block H, No's 22 & 23, The Green, Belview Wood. This is Phase 1K of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113810CY BCMS open-data feed
The construction of 129 no. 2/3 storey dwelling houses and associated site works. This is Phase 1H of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
129 units · 12,994.2 m²Builder not named
24 Apr 2024
CN0113651CY BCMS open-data feed
The construction of 36 no 2-storey dwelling houses and associated site works. This is Phase 1g of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
36 units · 3,339.9 m²Builder not named
24 Apr 2024
SN0009928CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block D, No's 42 & 43, The Green, Belview Wood. This is Phase 1e of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009909CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block C, No's 46 & 47, The Green, Belview Wood. This is Phase 1d of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009903CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block E, No's 11 & 12, The Green, Belview Wood. This is Phase 1f of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009742CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 9 & 10, The Green, Belview Wood. This is Phase 1b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
SN0009741CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 1 & 2, The Green, Belview Wood. This is Phase 1a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
CN0110170CY BCMS open-data feed
The construction of 8 no 2-storey dwelling houses and associated site works. This is Phase 1c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
8 units · 696.6 m²Builder not named
22 Feb 2024
CN0108602CY BCMS open-data feed
The construction of 19 no 2/3 storey dwelling houses and associated site works. This is Phase 1 of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
19 units · 2,308.4 m²Builder not named
02 Jan 2024
CN0080886CY BCMS owner-supplied export
Construction of 6No. Residential Units (Numbers 10, 11, 12, 14, 15 & 16) and all associated Site Works at 'The Mews', Belview Wood, Maryborough, Douglas, Co. Cork.
3,136.8 m²Builder named
13 Sep 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Sep 2026 · Latest notice
8 unique events
Waterford, Waterford · Waterford City and County Council · Planning ref 2560299
23 Dwelling houses
Reconciled event scale
24 units · 2,808 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Liam Neville Developments
Unique event Works stated Scale Commenced
CN0147750WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147749WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147736WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147734WD BCMS open-data feed
4no Apartments
4 units · 300 m²Builder not named
18 Sep 2026
CN0147606WD BCMS open-data feed
8 Dwelling houses
8 units · 936 m²Builder not named
18 Sep 2026
CN0145124WD BCMS open-data feed
16 Dwelling Houses
16 units · 1,872 m²Builder not named
27 Jul 2026
CN0141402WD BCMS owner-supplied export
23 Dwelling houses
2,691 m²Builder named
01 May 2026
CN0136842WD BCMS owner-supplied export
Construction of 24no 2 storey residential units
24 units · 2,808 m²Builder named
26 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Sep 2026 · Latest notice
2 unique events
Castlemahon, Limerick · Limerick City and County Council · Planning ref 24/60568
The construction of a terrace of 4 no. two storey (Block A) three bedroomed houses, a terrace of 6 no. two storey, three bedroomed houses(Block B).
Unique event Works stated Scale Commenced
CN0147108LL BCMS open-data feed
The construction of a terrace of 6 no. two storey (Block C) three bedroomed houses.
6 units · 624 m²Builder not named
18 Sep 2026
CN0134350LL BCMS owner-supplied export
The construction of a terrace of 4 no. two storey (Block A) three bedroomed houses, a terrace of 6 no. two storey, three bedroomed houses(Block B).
1,016 m²Builder named
09 Oct 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
Extension Material alteration Change of use
17 Sep 2026 · Latest notice
2 unique events
Cork, Cork · Cork City Council · Planning ref 20/39715
Material Alterations and change of use of Existing 5 storey building from Office & Storage to 7 no. Apartments on Second, Third & fourth floors including new Fifth floor Extension and new Residential Access & Refuse bin store at Ground Floor level.
Reconciled event scale
776 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
DMH Homes Ltd T/a DMH Construction
Unique event Works stated Scale Commenced
SN0014843CY BCMS open-data feed
Material alterations to include the internal fitout of a restaurant
222.7 m²Builder not named
17 Sep 2026
CN0086391CY BCMS owner-supplied export
Material Alterations and change of use of Existing 5 storey building from Office & Storage to 7 no. Apartments on Second, Third & fourth floors including new Fifth floor Extension and new Residential Access & Refuse bin store at Ground Floor level.
776 m²Builder named
24 Feb 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
16 Sep 2026 · Latest notice
3 unique events
Limerick, Limerick · Limerick City and County Council · Planning ref 25/60151
15 no. residential units; 4no. semi- detached houses (Types A & A1); 1no. detached house (Type D); 10no. terrace houses (Types B & D); and associated site works.
Unique event Works stated Scale Commenced
CN0147421LL BCMS open-data feed
Phase 3 of Bloodmills Residential Development - Units 22 - 31, comprising 1 no. block (Type F) containing 10 no. residential units, namely 5 no. ground floor apartments with 5 no. duplexes over.
10 unitsBuilder not named
16 Sep 2026
CN0146490LL BCMS open-data feed
Phase 2 of Bloodmills Residential Development - Units 16 - 21, comprising 1 no. terrace of 4 no. town houses (Type D) and 1 no. semi d units (Type E).
6 units · 537.3 m²Builder not named
19 Aug 2026
CN0141972LL BCMS owner-supplied export
15 no. residential units; 4no. semi- detached houses (Types A & A1); 1no. detached house (Type D); 10no. terrace houses (Types B & D); and associated site works.
1,192.3 m²Builder named
12 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
16 Sep 2026 · Latest notice
3 unique events
Malahide, Dublin · Fingal County Council · Planning ref LRD0043/S3E
Construction of 6 new dwelling houses and associated site works, 3 to 8 incl. Old Orchard Park, Back Road, Malahide, Co. Dublin.
Reconciled event scale
6 units · 737 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Carroll Estates Dublin Ltd
Unique event Works stated Scale Commenced
SN0014803FL BCMS open-data feed
Construction of Shell and Core Childcare Facility as permitted under planning permission ref; LRD0043/S3E at Old Orchard Place, Back Road Malahide Co. Dublin.
737 m²Builder not named
16 Sep 2026
CN0143180FL BCMS owner-supplied export
Construction of 6 new dwelling houses and associated site works, 3 to 8 incl. Old Orchard Park, Back Road, Malahide, Co. Dublin.
6 units · 494.8 m²Builder named
02 Jun 2026
CN0143038FL BCMS open-data feed
Construction of units 1-2 Old Orchard Drive part of the overall residential development permitted under planning permission LRD0043/S3E at Old Orchard, Back Road, Malahide.
2 units · 245 m²Builder not named
29 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
14 Sep 2026 · Latest notice
3 unique events
Tulla, Clare · Clare County Council · Planning ref 22708
The construction of 18 No houses (Nos 1 - 18) along with all associated site works and services at Loughaun South, Tulla, Co Clare.
Reconciled event scale
9 units · 2,339.0 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Clare Civil Engineering Ltd
Unique event Works stated Scale Commenced
CN0147178CE BCMS open-data feed
The construction of 2 No houses (Nos 26-27) along with all associated site works and services at Loughaun South, Tulla, Co Clare.
1 unit · 210 m²Builder not named
14 Sep 2026
CN0144360CE BCMS open-data feed
The construction of 9 No houses (Nos 19-25 & 28-29) along with all associated site works and services at Loughaun South, Tulla, Co Clare.
9 units · 993.2 m²Builder not named
03 Jul 2026
CN0138328CE BCMS owner-supplied export
The construction of 18 No houses (Nos 1 - 18) along with all associated site works and services at Loughaun South, Tulla, Co Clare.
2,339.0 m²Builder named
12 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
11 Sep 2026 · Latest notice
8 unique events
Knockatee, Dublin · Fingal County Council · Planning ref LRD0018/S3E
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
Reconciled event scale
52 units · 8,427.1 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Cairn Homes Construction Ltd
Unique event Works stated Scale Commenced
SN0014796FL BCMS open-data feed
Construction of Block 11, a Four Storey (Ground plus 3) residential block located off Holybanks Avenue on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains ancillary sprinkler plant and water storage area
42 units · 3,571.9 m²Builder not named
11 Sep 2026
SN0014400FL BCMS open-data feed
Construction of Block 3, a Five Storey (Ground plus 4) residential block located off Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.
52 units · 4,412 m²Builder not named
26 Jun 2026
SN0014307FL BCMS open-data feed
Construction of Block 2, a Five Storey (Ground plus 4) residential block located of Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.
52 units · 4,411.8 m²Builder not named
10 Jun 2026
SN0014170FL BCMS open-data feed
Construction of Block 1, a Five Storey (Ground plus 4) residential block located of Holybanks Boulevard on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a Ancillary Bike storage / Plant use.
38 units · 3,435 m²Builder not named
13 May 2026
SN0014089FL BCMS open-data feed
Construction of Block 5, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a community use which will be completed to shell and core standard.
27 units · 3,192.8 m²Builder not named
27 Apr 2026
CN0141585FL BCMS owner-supplied export
Phase 2 consisting of 16 No. back-to- back Townhouses comprising of: 16 No. three bedroom three storey houses.
1,880.5 m²Builder named
27 Apr 2026
SN0014010FL BCMS open-data feed
Construction of Block 4, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place Accessed from Glen Ellan Road, Swords, County Dublin. Block 04 will comprise of 27 no. residential apartment units. The building has a communal secure bicycle store at ground floor level. A Meter Room and Plant room are also located at ground floor level. The Retail Space and Creche will be completed to a shell finish. The Retail Space and Creche fit out will completed under a separate Commencement Notice.
27 units · 3,231.1 m²Builder not named
08 Apr 2026
CN0137143FL BCMS owner-supplied export
Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.
8,427.1 m²Builder named
05 Jan 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Sep 2026 · Latest notice
2 unique events
Waterford, Waterford · Waterford City and County Council · Planning ref 2560394
Housing development at Knightswood, Williamstown, Waterford - Ph3(52units)
Unique event Works stated Scale Commenced
CN0147207WD BCMS open-data feed
Duplex units development at 59-76 Knightswood Walk, Ph3 Knightswood
3 units · 523.1 m²Builder not named
10 Sep 2026
CN0139433WD BCMS owner-supplied export
Housing development at Knightswood, Williamstown, Waterford - Ph3(52units)
6,850.0 m²Builder named
14 Mar 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 Sep 2026 · Latest notice
5 unique events
Shankill, Dublin · Dun Laoghaire Rathdown County Council · Planning ref LRD24A/0382
Construction of 129no houses and all associated site works as part of the overall development described in planning permission LRD24A/0382 at Woodbrook, Shankill, Co. Dublin
Unique event Works stated Scale Commenced
SN0014755DR BCMS open-data feed
Construction of a new three storey building (Block J) consisting of 18 duplex units and 3 apartment units and all associated site works as described in planning permission ref LRD24A/0382
21 units · 2,723 m²Builder not named
09 Sep 2026
SN0014649DR BCMS open-data feed
Construction of a five storey apartment block consisting of 31no. apartments and all associated site works.
31 units · 3,617.9 m²Builder not named
21 Aug 2026
SN0014437DR BCMS open-data feed
Construction of a 4 storey apartment building consisting of 17no. apartments and all associated site works.
17 units · 1,490.8 m²Builder not named
14 Jul 2026
SN0014044DR BCMS open-data feed
Construction of 5 storey apartment building consisting of 24no. apartments and all associated site works as described in planning permission ref LRD24A/0382
24 units · 2,070 m²Builder not named
22 Apr 2026
CN0127819DR BCMS owner-supplied export
Construction of 129no houses and all associated site works as part of the overall development described in planning permission LRD24A/0382 at Woodbrook, Shankill, Co. Dublin
129 units · 13,969.2 m²Builder named
24 Apr 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Sep 2026 · Latest notice
2 unique events
Portlaoise, Laois · Laois County Council · Planning ref 2560311
Continuation of housing estate, Dargan Woods.The construction of 22 no. house units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
Reconciled event scale
22 units · 2,574.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Dargan Woods Devco Ltd; Brook Advantage Ltd; Hazeltip Ltd
Unique event Works stated Scale Commenced
SN0014540LS BCMS open-data feed
Continuation of housing estate, Dargan Woods.The construction of 4 Apartment units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
4 units · 265.8 m²Builder not named
07 Sep 2026
CN0142123LS BCMS owner-supplied export
Continuation of housing estate, Dargan Woods.The construction of 22 no. house units. The development includes all ancillary works to include an access road and footpaths, public lighting, water servicing including foul and storm water, landscaping and all ancillary site works
22 units · 2,574.4 m²Builder named
12 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
07 Sep 2026 · Latest notice
4 unique events
Ballinroad, Dungarvan, Waterford · Waterford City and County Council · Planning ref 25/60754
Kilminion, Dungarvan, Co. Wat erford:Construction of 10 no. dwellings (Nos. 28-33 &37-40) and all associated site development works.
Reconciled event scale
14 units · 3,504 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Dargan Woods Devco Ltd; Brook Advantage Ltd; Hazeltip Ltd
Unique event Works stated Scale Commenced
CN0147159WD BCMS open-data feed
Kilminion, Dungarvan, Co. Waterford: Construction of 14 no. dwellings (Nos. 1-8 & 13-18) and all associated site development works.
14 units · 1,122.8 m²Builder not named
07 Sep 2026
CN0145724WD BCMS open-data feed
Kilminion, Dungarvan, Co. Waterford: Construction of 10 no. dwellings (Nos. 9,11,12,19-25) and all associated site development works.
10 units · 2,172 m²Builder not named
29 Jul 2026
CN0144330WD BCMS open-data feed
Kilminion, Dungarvan, Co. Waterford:Construction of 6 no. dwellings (Nos. 10,26,27,34,35,36) and all associated site development works.
6 units · 3,504 m²Builder not named
01 Jul 2026
CN0142851WD BCMS owner-supplied export
Kilminion, Dungarvan, Co. Wat erford:Construction of 10 no. dwellings (Nos. 28-33 &37-40) and all associated site development works.
9 units · 1,178 m²Builder named
28 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
04 Sep 2026 · Latest notice
6 unique events
Swords, Dublin · Fingal County Council · Planning ref LRD0067/S3E
Construction of 156 no. 2 and 3 storey dwellings on lands to the South of Rathbeale Road, Mooretown, Swords, Dublin.
Unique event Works stated Scale Commenced
CN0147232FL BCMS open-data feed
Construction of a residential apartment block (Block BA04) consisting of 42 no. residential units, over 4 storeys, at Mooretown, Swords, Dublin.
42 units · 1,494.5 m²Builder not named
04 Sep 2026
CN0147231FL BCMS open-data feed
Construction of a residential duplex block (Block BZ04) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 1,110.4 m²Builder not named
04 Sep 2026
CN0147230FL BCMS open-data feed
Construction of a residential duplex block (Block BZ03) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 973.4 m²Builder not named
04 Sep 2026
CN0147229FL BCMS open-data feed
Construction of a residential duplex block (Block BZ02) comprising of 8 No. residential units at Mooretown, Swords, Dublin.
8 units · 935.8 m²Builder not named
04 Sep 2026
CN0147228FL BCMS open-data feed
Construction of a residential duplex block (Block BZ01) comprising of 10 No. residential units at Mooretown, Swords, Dublin.
10 units · 1,060.7 m²Builder not named
04 Sep 2026
CN0141637FL BCMS owner-supplied export
Construction of 156 no. 2 and 3 storey dwellings on lands to the South of Rathbeale Road, Mooretown, Swords, Dublin.
13,659.6 m²Builder named
29 Apr 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
04 Sep 2026 · Latest notice
3 unique events
Athboy, Meath · Meath County Council · Planning ref 2460667
Phase 1B -Construction of 13 No Dwelling Units (House Type B (6 No. Units), House Type K (1 No. Unit), House Type K1 1 No. Unit, House Type D 3 No. Units & House Type G 2 No. Units) and all ancillary works.
Unique event Works stated Scale Commenced
CN0146916MH BCMS open-data feed
Construction of 2 storey block containing 8 no. 1 bedroom apartments and associated works.
8 units · 451 m²Builder not named
04 Sep 2026
CN0142306MH BCMS owner-supplied export
Phase 1B -Construction of 13 No Dwelling Units (House Type B (6 No. Units), House Type K (1 No. Unit), House Type K1 1 No. Unit, House Type D 3 No. Units & House Type G 2 No. Units) and all ancillary works.
13 units · 1,400.3 m²Builder named
21 May 2026
CN0138177MH BCMS owner-supplied export
Phase 1A Construction of 19 No Dwelling Units (House Type A 2 No. Units, House Type B 8 No. Units, House Type K 4 No. Units, House Type H1 2 No. Units & House Type D1 3 No. Units) and all ancillary works.
2,079 m²Builder named
09 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
01 Sep 2026 · Latest notice
12 unique events
Cork, Cork · Cork City Council · Planning ref ABP-306325-20
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
Unique event Works stated Scale Commenced
CN0146852CY BCMS open-data feed
Construction of Phase 1 in Neighbourhood 4 of Longview Estates consisting of addresses 1-39 Rathárd View, and associated site works.
39 units · 3,792.8 m²Builder not named
01 Sep 2026
SN0014059CY BCMS open-data feed
69-80 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 69-80 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
SN0014058CY BCMS open-data feed
81-92 Árdan View - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 81-92 Árdan View, Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
23 Apr 2026
CN0127801CY BCMS open-data feed
Construction of neighbourhood 5 of Longview Estates (Árdan View) consisting of addresses 1-68, 93-178 Árdan View, and associated site works.
154 units · 15,540.3 m²Builder not named
21 Apr 2025
CN0120878CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
423.3 m²Builder named
15 Oct 2024
CN0117057CY BCMS owner-supplied export
Construction of addresses 7-11 Ráthard Avenue to be completed as part of neighbourhood 2 of Longview Estates (Ráthard), and associated site works.
Scale not statedBuilder named
15 Jul 2024
SN0010072CY BCMS open-data feed
1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 16no. residential units. Units as follows: 1-16 Rathárd Drive - Longview Estates, Ballyvolane, Cork
16 units · 1,500.6 m²Builder not named
19 Apr 2024
SN0010071CY BCMS open-data feed
67-75 Longview Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 9 no. residential units. Units as follows: 67-75 Longview Park - Longview Estates, Ballyvolane, Cork
9 units · 1,046.7 m²Builder not named
19 Apr 2024
SN0010070CY BCMS open-data feed
1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 12no. residential units. Units as follows: 1-12 Rathárd Park - Longview Estates, Ballyvolane, Cork
12 units · 1,125.7 m²Builder not named
19 Apr 2024
SN0010069CY BCMS open-data feed
1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork comprises the construction of 1no. block of duplex apartments incorporating 8no. residential units. Units as follows: 1-8 Rathárd Lawn - Longview Estates, Ballyvolane, Cork
8 units · 755.3 m²Builder not named
19 Apr 2024
CN0113377CY BCMS open-data feed
Construction of dwellings 1-66 Longview Park, consisting of 4 no. two-storey detached houses, 8 no. three-storey detached houses, 44 no. two-storey semi-detached houses, 6 no. three-story semi-detached houses, 4 no. two-story terraced houses in one block of four, and associated site works.
66 units · 7,841.5 m²Builder not named
19 Apr 2024
CN0113330CY BCMS open-data feed
Construction of neighbourhood 2 of Longview Estates (Ráthard) consisting of addresses 13-53 Ráthard Park, 9-47 Ráthard Lawn, 17-55 Ráthard Drive, 1-6 & 12-28 Ráthard Avenue, and associated site works.
142 units · 15,715.3 m²Builder not named
19 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
29 Aug 2026 · Latest notice
7 unique events
An Uaimh, Meath · Meath County Council · Planning ref 25/60539
Construction of 82 No. 2 storey dwelling houses, at No. 75 - 156 Athlumney, Navan, Co. Meath.
Unique event Works stated Scale Commenced
SN0014688MH BCMS open-data feed
The Construction of a two-storey childcare facility at Sommerville, Navan, Co. Meath.
426.2 m²Builder not named
29 Aug 2026
CN0140561MH BCMS owner-supplied export
Construction of 82 No. 2 storey dwelling houses, at No. 75 - 156 Athlumney, Navan, Co. Meath.
8,692.8 m²Builder named
08 Apr 2026
CN0139588MH BCMS owner-supplied export
Construction of 34 No. 2 storey dwelling houses, at No. 33 - 66 Athlumney, Navan, Co. Meath.
3,832.3 m²Builder named
13 Mar 2026
SN0013786MH BCMS open-data feed
Construction of Duplex Block C, dwelling Nos. 29 - 32 at Athlumney, Navan, Co. Meath. This development consists of 4 No. duplex apartments in a single 3-storey block comprising 2 No. 1 bedroom, single storey apartments at ground floor, and 2 No. 2bedroom, two storey apartments above at first and second floor.
4 units · 309.8 m²Builder not named
25 Feb 2026
CN0138098MH BCMS owner-supplied export
Construction of 8 No. 2 storey dwelling houses, at No. 67 - 74 Athlumney, Navan, Co. Meath. .
834 m²Builder named
06 Feb 2026
CN0138171MH BCMS owner-supplied export
Construction of Duplex Block B, dwelling Nos. 9 - 28 at Athlumney, Navan, Co. Meath. This development consists of 20 No. duplex apartments in a single 3-storey block comprising 4No. 1 bedroom and 6 No. 2 bedroom single storey apartments at ground floor, and 4 No. 2bedroom and 6 No. 3 bedroom 2 storey apartments above at first and second floor.
1,798.2 m²Builder named
05 Feb 2026
CN0138168MH BCMS owner-supplied export
Construction of Duplex Block A, dwellings Nos. 1 - 8 at Athlumney, Navan, Co. Meath. This development consists of 8 No. duplex apartments in a single 3-storey block comprising 4 No. 2 bedroom single storey apartments at ground floor, and 4 No. 3 bedroom 2 storey apartments above at first and second floor.
806 m²Builder named
05 Feb 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Aug 2026 · Latest notice
5 unique events
Ratoath, Meath · Meath County Council · Planning ref 24/60676
Construction of House No.1 and all associated site development works.
Unique event Works stated Scale Commenced
SN0014700MH BCMS open-data feed
Maisonette Units 60+61 Glebe Manor, Jamestown, Ratoath, Co.Meath.
1 unit · 204.9 m²Builder not named
28 Aug 2026
SN0014699MH BCMS open-data feed
Maisonette Units 56 + 57 Glebe Manor, Jamestown, Ratoath, Co.Meath
1 unit · 204.9 m²Builder not named
28 Aug 2026
SN0014698MH BCMS open-data feed
Maisonette Units 38+39 Glebe Manor, Jamestown, Ratoath, Co.Meath
1 unit · 204.9 m²Builder not named
28 Aug 2026
SN0014696MH BCMS open-data feed
Maisonette Units 29+30 Glebe Manor, Jamestown, Ratoath, Co.Meath
1 unit · 204.9 m²Builder not named
28 Aug 2026
CN0142853MH BCMS owner-supplied export
Construction of House No.1 and all associated site development works.
1 unit · 144 m²Builder named
29 May 2026
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Aug 2026 · Latest notice
3 unique events
Kilcock, Kildare · Kildare County Council · Planning ref 21/336
The construction of a new two storey commercial building (to shell and core only) at Molly Ware Street, Kilcock, Co. Kildare.
Unique event Works stated Scale Commenced
CN0146485KE BCMS open-data feed
Fit out to completion of the ground floor coffee shop permitted under planning register ref no. 21/336 at Molly Ware Street, (Courtown Road) Kilcock for Mr. Brian Larkin. The shell and core of this building has been completed and certified under CCKE
48.9 m²Builder not named
26 Aug 2026
CN0143547KE BCMS owner-supplied export
Fit out and completion of first floor unit at Molly Ware Street (Courtown Road), Kilcock, Co. Kildare for Mr. . The shell and core of this building are complete and have been certified under CCKE
61.9 m²Builder not named
19 Jun 2026
CN0116372KE BCMS owner-supplied export
The construction of a new two storey commercial building (to shell and core only) at Molly Ware Street, Kilcock, Co. Kildare.
113 m²Builder named
20 Jun 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Aug 2026 · Latest notice
2 unique events
Clonmel, Tipperary · Tipperary County Council · Planning ref 21654
Construction of 20 no. 2 bed bungalows including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
Unique event Works stated Scale Commenced
CN0146559TT BCMS open-data feed
20 no. New 2 bed bungalows and repairs to existing lodge house
21 units · 1,480 m²Builder not named
21 Aug 2026
CN0113534TT BCMS owner-supplied export
Construction of 20 no. 2 bed bungalows including work to common areas and infrastructure relevant to these units in respect of the second schedule of the Building Regulations.
1,314 m²Builder named
22 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.