Back to leads
Going to siteCurrent commencement

The development will consist of the following: demolish one redundant boiler chimney (east elevation), removal of existing pop-out pitched roof and replacement with a flat roof (south elevation), refurbish dormer (east elevation), garage conversion (east elevation), construction of new extension and terrace to the rear (south elevation), provision of skylights (east elevation), replace existing cladding with render (north elevation), alteration to the porch depth, alteration to porch and first floor openings (north elevation), provide a new connection to Uisce Éireann public effluent treatment system and all associated site works

Sligo / Rosses Point / Rosses Point, Sligo

Create alert Official file
Est. value Not listed
Units 1
Floor area 8 m²
Commenced 19 Apr 2025

Key facts

Lead summary

Commenced date
19 Apr 2025
Builder / developer
JF Construction
Planning permission
PL24/60441
Local authority
Sligo County Council
Source reference
CN0128143SO
Units
1
Floor area
8 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The development will consist of the following: demolish one redundant boiler chimney (east elevation), removal of existing pop-out pitched roof and replacement with a flat roof (south elevation), refurbish dormer (east elevation), garage conversion (east elevation), construction of new extension and terrace to the rear (south elevation), provision of skylights (east elevation), replace existing cladding with render (north elevation), alteration to the porch depth, alteration to porch and first floor openings (north elevation), provide a new connection to Uisce Éireann public effluent treatment system and all associated site works

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert