Back to leads
Going to siteCurrent commencement

(1) DEMOLITION OF EXISTING STONE SHEDS TO THE SIDE OF THE DWELLING, (2) CONSTRUCTION OF A…

Donegal / Falcarragh / Falcarragh, Donegal

Create alert Official file
Est. value Not listed
Units 1
Floor area 251 m²
Commenced 8 May 2025

Key facts

Lead summary

Commenced date
8 May 2025
Planning permission
2460489
Local authority
Donegal County Council
Source reference
CN0128284DL
Units
1
Floor area
251 m²
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

(1) DEMOLITION OF EXISTING STONE SHEDS TO THE SIDE OF THE DWELLING, (2) CONSTRUCTION OF A NEW TWO STOREY EXTENSION TO THE REAR OF THE PROPERTY AND RAISING RIDGE HEIGHT OF EXISTING DWELLING, (3) ALTERATIONS TO THE FENESTRATION OF THE EXISTING DWELLING, (4) CONSTRUCTION OF A DOMESTIC GARAGE, (5) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert