Back to leads
Est. value
Not listed
Units
Not listed
Floor area
47 m²
Commenced
6 May 2025
Going to siteCurrent commencement
Construction of an extension to the side and rear of our existing dwelling to include on the first floor a bedroom and en-suite and on the ground floor a kitchen and dining area with 2 Velux windows and a Velux in the attic with all ancillary site works
Dublin / Lucan / Lucan, Dublin
Key facts
Lead summary
- Commenced date
- 6 May 2025
- Builder / developer
- New Age Concept Ltd
- Planning permission
- SD25B/0008W
- Local authority
- South Dublin County Council
- Source reference
- CN0128299SD
- Floor area
- 47 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Construction of an extension to the side and rear of our existing dwelling to include on the first floor a bedroom and en-suite and on the ground floor a kitchen and dining area with 2 Velux windows and a Velux in the attic with all ancillary site works
Verify against official sourceLikely trades & supplier leads