Back to leads
Est. value
Not listed
Units
Not listed
Floor area
25 m²
Commenced
4 Jun 2025
Going to siteCurrent commencement
Proposed buildup of Existing hip in roof to side of roof into Dutch hip with window in proposed gable wall at attic level. Proposed attic conversion to habitable space with dormer roof window on rear slope of roof at attic level
Dublin / Lucan / Lucan, Dublin
Key facts
Lead summary
- Commenced date
- 4 Jun 2025
- Builder / developer
- Ultimate Construction
- Planning permission
- SD25B/0067
- Local authority
- South Dublin County Council
- Source reference
- CN0129353SD
- Floor area
- 25 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Proposed buildup of Existing hip in roof to side of roof into Dutch hip with window in proposed gable wall at attic level. Proposed attic conversion to habitable space with dormer roof window on rear slope of roof at attic level
Verify against official sourceLikely trades & supplier leads