Going to siteCurrent commencement

(i) an external heat pump and primary pumps compound, (ii) liquid oxygen compound, comprised of a VIE (vacuum insulated evaporator) liquid oxygen primary tank (20,000 litres) of 8.40m in height and back-up VIE liquid oxygen tank (10,000 litres) of 7.50m in height, vaporisers 4.32m in height) and associated manifold plant room, (iii) bottle gases stores rooms, (iv) vacuum and medical air plant room, (v) an external high temperature heat pump compound, (vi) mediumvoltage, transformer and offloader rooms, (vii) backup electricity generator compound with associated fuel tank (18,000 litres) of 2.8m height, (viii) an external condenser unit compound, (ix) relocation of existing carparking and, (x) hardstanding, fencing, and all associated site works necessary to facilitate the development

Dublin / Swords / Swords, Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area 148 m²
Commenced 30 May 2025

Key facts

Lead summary

Commenced date
30 May 2025
Builder / developer
John Sisk & Son Holding Ltd
Planning permission
F24A/0732E
Local authority
Fingal County Council
Source reference
CN0129379FL
Floor area
148 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

(i) an external heat pump and primary pumps compound, (ii) liquid oxygen compound, comprised of a VIE (vacuum insulated evaporator) liquid oxygen primary tank (20,000 litres) of 8.40m in height and back-up VIE liquid oxygen tank (10,000 litres) of 7.50m in height, vaporisers 4.32m in height) and associated manifold plant room, (iii) bottle gases stores rooms, (iv) vacuum and medical air plant room, (v) an external high temperature heat pump compound, (vi) mediumvoltage, transformer and offloader rooms, (vii) backup electricity generator compound with associated fuel tank (18,000 litres) of 2.8m height, (viii) an external condenser unit compound, (ix) relocation of existing carparking and, (x) hardstanding, fencing, and all associated site works necessary to facilitate the development

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert