Back to leads
Going to siteCurrent commencement

Construction of single storey extensions to the sides, front and rear of existing dwelling, alterations to the existing elevations, to decommission the existing septic tank and replace with a wastewater treatment system

Kerry / Tuosist / Tuosist, Kerry

Create alert Official file
Est. value Not listed
Units 1
Floor area 215 m²
Commenced 4 Jul 2025

Key facts

Lead summary

Commenced date
4 Jul 2025
Planning permission
24/323
Local authority
Kerry County Council
Source reference
CN0130464KY
Units
1
Floor area
215 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

Construction of single storey extensions to the sides, front and rear of existing dwelling, alterations to the existing elevations, to decommission the existing septic tank and replace with a wastewater treatment system

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert