Going to siteCurrent commencement

The project comprises the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The form of construction is a single storey steel frame structure clad with a single skin cladding on the roof and around 3 sides. The storm drainage will be routed to the existing netowrk on site

Offaly / Tullamore / Tullamore, Offaly

Create alert Source
Est. value Not listed
Units Not listed
Floor area 59 m²
Commenced 20 Aug 2025

Key facts

Lead summary

Commenced date
20 Aug 2025
Builder / developer
Ormonde Construction Ltd
Planning permission
2460529
Local authority
Offaly County Council
Source reference
CN0132026OY
Floor area
59 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The project comprises the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 m²) on an existing concrete yard slab. The form of construction is a single storey steel frame structure clad with a single skin cladding on the roof and around 3 sides. The storm drainage will be routed to the existing netowrk on site