Back to leads
Est. value
Not listed
Units
Not listed
Floor area
59 m²
Commenced
20 Aug 2025
Going to siteCurrent commencement
The project comprises the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 sqm) on an existing concrete yard slab. The form of construction is a single storey steel frame structure clad with a single skin cladding on the roof and around 3 sides. The storm drainage will be routed to the existing netowrk on site
Offaly / Tullamore / Tullamore, Offaly
Key facts
Lead summary
- Commenced date
- 20 Aug 2025
- Builder / developer
- Ormonde Construction Ltd
- Planning permission
- 2460529
- Local authority
- Offaly County Council
- Source reference
- CN0132026OY
- Floor area
- 59 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The project comprises the construction of a 12.8m x 4.6m x 4.5m high forklift charging station (58.88 m²) on an existing concrete yard slab. The form of construction is a single storey steel frame structure clad with a single skin cladding on the roof and around 3 sides. The storm drainage will be routed to the existing netowrk on site
Verify against official sourceLikely trades & supplier leads