Back to leads
Est. value
Not listed
Units
Not listed
Floor area
234 m²
Commenced
19 Aug 2025
Going to siteCurrent commencement
The development will consist of the following
Dublin / Raheny / Raheny, Dublin
Key facts
Lead summary
- Commenced date
- 19 Aug 2025
- Planning permission
- WEB1701/25
- Local authority
- Dublin City Council
- Source reference
- CN0132186DC
- Floor area
- 234 m²
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The development will consist of the following: (a) The construction of a single storey ground floor extension to the rear with rooflights. (b) The change in roof profile from hipped roof to dutch gable ended roof to accommodate a conversion to the existing attic space. (c) The addition of an opaque gable end window. (d) New dormer window to the rear with Juliet balcony. (e) The alteration of the front porch roof design and height. (f) The installation of 3 number rooflights to the front roof slope. (g) The development is to include for internal alterations, drainage and all associated site works
Verify against official sourceLikely trades & supplier leads