Back to leads
Going to siteCurrent commencement

The development will consist of the construction of a dormer window in the attic level to the rear of the property and rooflight in the main roof to the front of the property, removing the existing chimney, repositioning and narrowing of the existing vehicular entrance to the rear, the creation of two windows in the gable wall and all associated site works

Dublin / Dublin / Dublin, Dublin

Create alert Official file
Est. value Not listed
Units 1
Floor area 8 m²
Commenced 20 Oct 2025

Key facts

Lead summary

Commenced date
20 Oct 2025
Builder / developer
Tahoe Building Ltd
Planning permission
D25B/0222/WEB
Local authority
DĂșn-Laoghaire Rathdown County Council
Source reference
CN0134477DR
Units
1
Floor area
8 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The development will consist of the construction of a dormer window in the attic level to the rear of the property and rooflight in the main roof to the front of the property, removing the existing chimney, repositioning and narrowing of the existing vehicular entrance to the rear, the creation of two windows in the gable wall and all associated site works

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert