Back to leads
Est. value
Not listed
Units
1
Floor area
8 m²
Commenced
20 Oct 2025
Going to siteCurrent commencement
The development will consist of the construction of a dormer window in the attic level to the rear of the property and rooflight in the main roof to the front of the property, removing the existing chimney, repositioning and narrowing of the existing vehicular entrance to the rear, the creation of two windows in the gable wall and all associated site works
Dublin / Dublin / Dublin, Dublin
Key facts
Lead summary
- Commenced date
- 20 Oct 2025
- Builder / developer
- Tahoe Building Ltd
- Planning permission
- D25B/0222/WEB
- Local authority
- DĂșn-Laoghaire Rathdown County Council
- Source reference
- CN0134477DR
- Units
- 1
- Floor area
- 8 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The development will consist of the construction of a dormer window in the attic level to the rear of the property and rooflight in the main roof to the front of the property, removing the existing chimney, repositioning and narrowing of the existing vehicular entrance to the rear, the creation of two windows in the gable wall and all associated site works
Verify against official sourceLikely trades & supplier leads