Back to leads
Est. value
Not listed
Units
Not listed
Floor area
7 m²
Commenced
26 Oct 2025
Going to siteCurrent commencement
Attic conversion for new bedroom and ensuite, including removal of existing chimney, increased roof height with modification from hipped to half- hipped roof profile, raised gable walls on both sides, gable window to each side, rear dormer extension, and two rooflights to the front roof slope
Dublin / Dublin / Dublin, Dublin
Key facts
Lead summary
- Commenced date
- 26 Oct 2025
- Planning permission
- SD25B/0438W
- Local authority
- South Dublin County Council
- Source reference
- CN0134859SD
- Floor area
- 7 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Attic conversion for new bedroom and ensuite, including removal of existing chimney, increased roof height with modification from hipped to half- hipped roof profile, raised gable walls on both sides, gable window to each side, rear dormer extension, and two rooflights to the front roof slope
Verify against official sourceLikely trades & supplier leads