Back to leads
Est. value
Not listed
Units
1
Floor area
48 m²
Commenced
7 Nov 2025
Going to siteCurrent commencement
Extension, conversion and alteration works to the ground and first floor consisting of a…
Dublin / Dublin / Dublin, Dublin
Key facts
Lead summary
- Commenced date
- 7 Nov 2025
- Planning permission
- D25B/0432/WEB
- Local authority
- Dún-Laoghaire Rathdown County Council
- Source reference
- CN0135342DR
- Units
- 1
- Floor area
- 48 m²
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Extension, conversion and alteration works to the ground and first floor consisting of a single storey flat roof extension with rooflights to the front, side and rear of the ground floor, which includes the conversion of existing garage area to the side; a flat roofed dormer window extension on the first floor to the side of the existing pitched roof, new external rendered insulation to the existing 2-storey front, remaining single storey side and first floor rear elevations including all removal, alterations and associated site works
Verify against official sourceLikely trades & supplier leads