Back to leads
Going to siteCurrent commencement

The works involve refurbishing the existing premises with new external façade alterations, including a new entrance with a revolving door, glazed façade, and full accessibility upgrades. Internally, the ground floor reception, lift lobby, corridors, and WC/shower facilities will be fully stripped out and refurbished with new finishes and building services. Additional upgrades include accessible lift lobby doors on upper floors and minor internal alterations and finishes within the basement

Dublin / Dublin 2 / Dublin 2, Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area 361 m²
Commenced 29 Jan 2026

Key facts

Lead summary

Commenced date
29 Jan 2026
Builder / developer
Grant Fit Out (UK) Ltd
Planning permission
WEB2018/24
Local authority
Dublin City Council
Source reference
CN0137765DC
Floor area
361 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The works involve refurbishing the existing premises with new external façade alterations, including a new entrance with a revolving door, glazed façade, and full accessibility upgrades. Internally, the ground floor reception, lift lobby, corridors, and WC/shower facilities will be fully stripped out and refurbished with new finishes and building services. Additional upgrades include accessible lift lobby doors on upper floors and minor internal alterations and finishes within the basement

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert