The Development consists of
Dublin / Terenure / Terenure, Dublin
Key facts
Lead summary
- Commenced date
- 2 Feb 2026
- Builder / developer
- DPM Construction
- Planning permission
- 3418/24
- Local authority
- Dublin City Council
- Source reference
- CN0137946DC
- Floor area
- 115 m²
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The Development consists of: 1) The demolition of the existing structurally unsound two storey return and annexe to the rere elevation (south); 2) The construction of a new, two-storey extension to the rere elevation (south) of the existing building with flat green roof and parapet: The west elevation to the proposed extension is reduced to a single storey where it addresses the shared boundary wall between number 77 & 76 Brighton Square; 3) The provision at ground level of 1no. window to existing and 1no window to proposed east facing gable elevation and the provision at first floor level of 1no. window to proposed extension; 4) The provision of 2no flat rooflights to roof of single storey portion of extension and the provision on 1no flat rooflight to two storey portion of extension; 5) All associated external drainage and site works
Verify against official sourceLikely trades & supplier leads