Back to leads
Going to siteCurrent commencement

The Development consists of

Dublin / Terenure / Terenure, Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area 115 m²
Commenced 2 Feb 2026

Key facts

Lead summary

Commenced date
2 Feb 2026
Builder / developer
DPM Construction
Planning permission
3418/24
Local authority
Dublin City Council
Source reference
CN0137946DC
Floor area
115 m²
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The Development consists of: 1) The demolition of the existing structurally unsound two storey return and annexe to the rere elevation (south); 2) The construction of a new, two-storey extension to the rere elevation (south) of the existing building with flat green roof and parapet: The west elevation to the proposed extension is reduced to a single storey where it addresses the shared boundary wall between number 77 & 76 Brighton Square; 3) The provision at ground level of 1no. window to existing and 1no window to proposed east facing gable elevation and the provision at first floor level of 1no. window to proposed extension; 4) The provision of 2no flat rooflights to roof of single storey portion of extension and the provision on 1no flat rooflight to two storey portion of extension; 5) All associated external drainage and site works