Back to leads
Est. value
Not listed
Units
Not listed
Floor area
39 m²
Commenced
23 Feb 2026
Going to siteCurrent commencement
The proposed development comprises Demolition of the following
Dublin / Glasnevin / Glasnevin, Dublin
Key facts
Lead summary
- Commenced date
- 23 Feb 2026
- Builder / developer
- BRM Building Ltd
- Planning permission
- WEB2535/25
- Local authority
- Dublin City Council
- Source reference
- CN0138509DC
- Floor area
- 39 m²
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The proposed development comprises Demolition of the following; single storey dining room to rear (west) and single storey utility room to side (south) of existing dwelling, and Construction of the following; single storey extension to rear (west) of existing dwelling with flat roof and rooflight, non- habitable loft conversion with box dormer to rear (west) elevation, extension of existing hipped roof over existing first floor flat roof to side (south) making the front elevation 2 storey with hipped roof along its extents
Verify against official sourceLikely trades & supplier leads