Back to leads
Est. value
Not listed
Units
Not listed
Floor area
176 m²
Commenced
6 Mar 2026
Going to siteCurrent commencement
a) removal of existing chimney, boiler-room and carport, and b) the construction of a two-storey extension to side of dwelling, with rooflights, maintaining existing ridge height, c) alterations to fenestration of existing dwelling, d) widening of existing vehicular entrance to 3.5m, and all associated site works
Dublin / Dublin
Key facts
Lead summary
- Commenced date
- 6 Mar 2026
- Builder / developer
- Allagour Construction Ltd
- Planning permission
- SD25B/0378W
- Local authority
- South Dublin County Council
- Source reference
- CN0139277SD
- Floor area
- 176 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
a) removal of existing chimney, boiler-room and carport, and b) the construction of a two-storey extension to side of dwelling, with rooflights, maintaining existing ridge height, c) alterations to fenestration of existing dwelling, d) widening of existing vehicular entrance to 3.5m, and all associated site works
Verify against official sourceLikely trades & supplier leads