Back to leads
Going to siteCurrent commencement

The development will consist of

Dublin / Killiney / Killiney, Dublin

Create alert Official file
Est. value Not listed
Units 1
Floor area 194 m²
Commenced 26 Mar 2026

Key facts

Lead summary

Commenced date
26 Mar 2026
Planning permission
D25A/0942/WEB
Local authority
Dún-Laoghaire Rathdown County Council
Source reference
CN0139968DR
Units
1
Floor area
194 m²
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

The development will consist of: (a) removal of a chimney stack, (b) replacement of roof to the rear room with a hipped roof and finished to match existing, (c) structural works to the existing roof retaining the existing profile, (d) alterations to existing openings on the elevations, (e) proposed front and rear dormer structures, (f) proposed additional rooflights to the side and rear roof pitches, (g) proposed front porch, (h) proposed external insulation to the envelope, (i) widening of existing vehicular entrance

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert