Back to leads
Est. value
Not listed
Units
1
Floor area
194 m²
Commenced
26 Mar 2026
Going to siteCurrent commencement
The development will consist of
Dublin / Killiney / Killiney, Dublin
Key facts
Lead summary
- Commenced date
- 26 Mar 2026
- Planning permission
- D25A/0942/WEB
- Local authority
- Dún-Laoghaire Rathdown County Council
- Source reference
- CN0139968DR
- Units
- 1
- Floor area
- 194 m²
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The development will consist of: (a) removal of a chimney stack, (b) replacement of roof to the rear room with a hipped roof and finished to match existing, (c) structural works to the existing roof retaining the existing profile, (d) alterations to existing openings on the elevations, (e) proposed front and rear dormer structures, (f) proposed additional rooflights to the side and rear roof pitches, (g) proposed front porch, (h) proposed external insulation to the envelope, (i) widening of existing vehicular entrance
Verify against official sourceLikely trades & supplier leads