Back to leads
Est. value
Not listed
Units
1
Floor area
170 m²
Commenced
12 May 2026
Going to siteCurrent commencement
Conversion of existing attic space to storage and habitable use, including the construction of a new dormer to the rear roof slope and internal structural alterations. Also includes the construction of a single-storey extension (sunroom) attached to the rear of the dwelling, with all associated internal alterations, and drainage
Dublin / Blackrock / Blackrock, Dublin
Key facts
Lead summary
- Commenced date
- 12 May 2026
- Builder / developer
- FIOR Insulation AND FIRE Protection LTD
- Planning permission
- D25B/0625/WEB
- Local authority
- DĂșn-Laoghaire Rathdown County Council
- Source reference
- CN0142258DR
- Units
- 1
- Floor area
- 170 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Conversion of existing attic space to storage and habitable use, including the construction of a new dormer to the rear roof slope and internal structural alterations. Also includes the construction of a single-storey extension (sunroom) attached to the rear of the dwelling, with all associated internal alterations, and drainage
Verify against official sourceLikely trades & supplier leads