Back to leads
Going to siteCurrent commencement

the removal of a brick garden wall to the rear, construction of a single storey extension to the rear, construction of a single storey shed to the rear, remodelling of the stairs and landing between basement level and entrance level, breaking out of an ope to rear lower landing level to make connection to extension, modification of ope to side of lower landing level to make connection to extension, installation of ensuite bathroom

Dublin / Dublin 2 / Dublin 2, Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area 378 m²
Commenced 1 Jun 2026

Key facts

Lead summary

Commenced date
1 Jun 2026
Builder / developer
Andrei Construction Ltd
Planning permission
WEB5021/25
Local authority
Dublin City Council
Source reference
CN0142645DC
Floor area
378 m²
Lead lane
Current owner-export commencement
Outreach timing note
Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.

Official description

Verbatim source text

the removal of a brick garden wall to the rear, construction of a single storey extension to the rear, construction of a single storey shed to the rear, remodelling of the stairs and landing between basement level and entrance level, breaking out of an ope to rear lower landing level to make connection to extension, modification of ope to side of lower landing level to make connection to extension, installation of ensuite bathroom

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert