Back to leads
Est. value
Not listed
Units
Not listed
Floor area
174 m²
Commenced
22 Jun 2026
Going to siteCurrent commencement
The proposed development will consist of; a) Demolition of existing shed in rear garden abutting neighbouring structure, b) Demolition of existing chimney to rear, c) Single storey flat roof extension to the rear with 2no. rooflights, d) Conversion of existing garage to habitable space, e) First floor extension to the side with new gable roof, f) Flat roof canopy to front door g) Alterations to front elevation, h) Widening of existing entrance gate to 3.5 m and all associated site works. and all associated site works
Dublin / Dublin 12 / Dublin 12, Dublin
Key facts
Lead summary
- Commenced date
- 22 Jun 2026
- Builder / developer
- Tim Dooley Construction LTD
- Planning permission
- SD25B/0481
- Local authority
- South Dublin County Council
- Source reference
- CN0143488SD
- Floor area
- 174 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
The proposed development will consist of; a) Demolition of existing shed in rear garden abutting neighbouring structure, b) Demolition of existing chimney to rear, c) Single storey flat roof extension to the rear with 2no. rooflights, d) Conversion of existing garage to habitable space, e) First floor extension to the side with new gable roof, f) Flat roof canopy to front door g) Alterations to front elevation, h) Widening of existing entrance gate to 3.5 m and all associated site works. and all associated site works
Verify against official sourceLikely trades & supplier leads