Back to leads
Est. value
Not listed
Units
1
Floor area
167 m²
Commenced
22 Jun 2026
Going to siteCurrent commencement
Demolition of existing light industrial building and the construction of a 2-storey dwelling, within the curtilage of the existing protected stone walls of Inchicore Terrace South, Dublin
Dublin / Dublin 8 / Dublin 8, Dublin
Key facts
Lead summary
- Commenced date
- 22 Jun 2026
- Planning permission
- 3731/23
- Local authority
- Dublin City Council
- Source reference
- CN0143570DC
- Units
- 1
- Floor area
- 167 m²
- Lead lane
- Current owner-export commencement
- Outreach timing note
- Warm timing: this route is limited to current owner-export commencement rows where public display is allowed.
Official description
Verbatim source text
Demolition of existing light industrial building and the construction of a 2-storey dwelling, within the curtilage of the existing protected stone walls of Inchicore Terrace South, Dublin
Verify against official sourceLikely trades & supplier leads