Development Description
for works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works
Map
No coordinates supplied in the public planning feed.