Infrastructure, Bailick No.1 Wastewater Pumping Site, Bailick Road Kennedy Park...

Midleton, Cork · Cork County Council · Plan 24/5937 · PB ref PB-10000081282

Permission for the Midleton Wastewater Loading Diversion Project which will consist of the provision of a new foul pumping station and rising main connection to Water-Rock wwps. The works include: 1. New foul pumping station (Midleton South) located within the existing Bailick No.1 wastewater pumping station site, to include...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 15 May 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 15 May 2025. / Confidence: Low
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Permission for the Midleton Wastewater Loading Diversion Project which will consist of the provision of a new foul pumping station and rising main connection to Water-Rock wwps. The works include: 1. New foul pumping station (Midleton South) located within the existing Bailick No.1 wastewater pumping station site, to include wet well, valve chamber, flowmeter chamber, mcc kiosk, wash water kiosk, lighting, vent stack and all necessary mechanical and civil works to accommodate the proposal. 2. Alterations to the...

Ref 24/5937 Source-linked Official application description for exact planning reference 24/5937
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

2 packages
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

24/5937 Explicit description / Source-linked Source
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

24/5937 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Cork County Council
Exact reference
24/5937
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

24/5937Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

24/5937Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

24/5937Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

Permission for the Midleton Wastewater Loading Diversion Project which will consist of the provision of a new foul pumping station and rising main connection to Water-Rock wwps. The works include: 1. New foul pumping station (Midleton South) located within the existing Bailick No.1 wastewater pumping station site, to include wet well, valve chamber, flowmeter chamber, mcc kiosk, wash water kiosk, lighting, vent stack and all necessary mechanical and civil works to accommodate the proposal. 2. Alterations to the existing site access at Bailick No.1 wwps site will require removal of sections of the existing wall / hedgerow. To be replaced with a new fence behind the visibility lines. 3. Approximately 1,800m of rising main connecting the Midleton South WwPS to the Water-Rock wwps, to include air / scoure valve chambers and 6m vent stack at Kennedy Park. The route will travel along Bailick Road, Kennedy Park and Riverside Way. Adjacent to Midleton Gyratory, the route will cross the Owenacurra river using trenchless methods and run along Market Green Plaza to Market Green. A Natura Impact Statement will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 24/5937

Permission for the Midleton Wastewater Loading Diversion Project which will consist of the provision of a new foul pumping station and rising main connection to Water-Rock wwps. The works include: 1. New foul pumping station (Midleton South) located within the existing Bailick No.1 wastewater pumping station site, to include wet well, valve chamber, flowmeter chamber, mcc kiosk, wash water kiosk, lighting, vent stack and all necessary mechanical and civil works to accommodate the proposal. 2. Alterations to the existing site access at Bailick No.1 wwps site will require removal of sections of the existing wall / hedgerow. To be replaced with a new fence behind the visibility lines. 3. Approximately 1,800m of rising main connecting the Midleton South WwPS to the Water-Rock wwps, to include air / scoure valve chambers and 6m vent stack at Kennedy Park. The route will travel along Bailick Road, Kennedy Park and Riverside Way. Adjacent to Midleton Gyratory, the route will cross the Owenacurra river using trenchless methods and run along Market Green Plaza to Market Green. A Natura Impact Statement will be submitted to the planning authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.

AuthorityCork County Council
Reference24/5937