Energy, ESB Aghada Generating Station, Townlands of Ballincarroonig and Aghada...
Electricity Supply Board (ESB) intends to apply for Permission for development at a 10.22 hectare site within ESB Aghada Generating Station. The Proposed Development includes amendments to the development described in the planning application granted planning permission (Planning Reference No. 23/5104) dated the 7th of...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 6 Jul 2026. / Confidence: LowDecision date 6 Jul 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
Electricity Supply Board (ESB) intends to apply for Permission for development at a 10.22 hectare site within ESB Aghada Generating Station. The Proposed Development includes amendments to the development described in the planning application granted planning permission (Planning Reference No. 23/5104) dated the 7th of December 2023 by Cork County Council (CCC). The proposed amendments are: i. An air insulated switchgear (AIS) compound to replace the previously approved gas insulated switchgear (GIS) building...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Cork County Council
- Exact reference
- 26/1242
- Evidence reviewed
- 7 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not available yet
- Planning agent
- not available yet
More Cork planning activity
These are county discovery links, not claimed relationships to this application.
Application text
Electricity Supply Board (ESB) intends to apply for Permission for development at a 10.22 hectare site within ESB Aghada Generating Station. The Proposed Development includes amendments to the development described in the planning application granted planning permission (Planning Reference No. 23/5104) dated the 7th of December 2023 by Cork County Council (CCC). The proposed amendments are: i. An air insulated switchgear (AIS) compound to replace the previously approved gas insulated switchgear (GIS) building (in same location and similar in area), ii. A new 49m² control room (3.6 m high) within the AIS compound, iii. Reconfiguration of the approved rainwater drainage system, iv. A new underground firewater retention basin (approx. dimensions: 280 m² / 700m3). The development consists of an activity for which an Industrial Emissions Licence is required. ESB Aghada Generating Station is a registered lower tier establishment under the Control of Major Accident Hazard (COMAH) Regulations, 2015. The development will consist of the provision of, or amendments to, an establishment within the meaning of Part 11 of the Planning and Development Regulations (Major Accidents Directive). An Environmental Impact Assessment Report (EIAR) complying with the European Union (Planning and Development) (Environmental Assessment) Regulations 2018 (S.I. 296 of 2018) and a Natura Impact Statement (NIS) were submitted to the Planning Authority with the previously approved application. An Environmental Effects Compliance Report and Ecology Technical Note accompany this application confirming no changes to the previous conclusions.
Application to site progress
-
Applied 12 May 2026 26/1242
-
Decision Grant with Conditions 6 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 26/1242
Electricity Supply Board (ESB) intends to apply for Permission for development at a 10.22 hectare site within ESB Aghada Generating Station. The Proposed Development includes amendments to the development described in the planning application granted planning permission (Planning Reference No. 23/5104) dated the 7th of December 2023 by Cork County Council (CCC). The proposed amendments are: i. An air insulated switchgear (AIS) compound to replace the previously approved gas insulated switchgear (GIS) building (in same location and similar in area), ii. A new 49m² control room (3.6 m high) within the AIS compound, iii. Reconfiguration of the approved rainwater drainage system, iv. A new underground firewater retention basin (approx. dimensions: 280 m² / 700m3). The development consists of an activity for which an Industrial Emissions Licence is required. ESB Aghada Generating Station is a registered lower tier establishment under the Control of Major Accident Hazard (COMAH) Regulations, 2015. The development will consist of the provision of, or amendments to, an establishment within the meaning of Part 11 of the Planning and Development Regulations (Major Accidents Directive). An Environmental Impact Assessment Report (EIAR) complying with the European Union (Planning and Development) (Environmental Assessment) Regulations 2018 (S.I. 296 of 2018) and a Natura Impact Statement (NIS) were submitted to the Planning Authority with the previously approved application. An Environmental Effects Compliance Report and Ecology Technical Note accompany this application confirming no changes to the previous conclusions.
Open official record