New Application · decision due 11 Nov 2026Pre-decision · not yet granted

Energy, The townlands of Coom (Hudson), Mullenaboree, Knockaunalour...

County, Cork · Cork County Council · Plan 26/2424 · PB ref PB-2340984698

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 11 Nov 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Decision-dependent

The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 11 Nov 2026; no procurement timetable is published.

Decision due 11 Nov 2026 / Confidence: Medium
Decision deadline 11 Nov 2026

Public planning decision due date; the authority may update it.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / A scheme cannot commence under this application before permission.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays...

Ref 26/2424 Source-linked Official application description for exact planning reference 26/2424
Open scope evidence

Public source roles

Coom Green Energy Park Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

1 package
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

26/2424 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Cork County Council
Exact reference
26/2424
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

26/2424Explicit application record
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

26/2424Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Coom Green Energy Park Ltd
Planning agent
Fehily Timoney and Company
Official description

Application text

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 26/2424

We, Coom Green Energy Park Limited, intend to apply for permission for a Renewable Energy Development (RED III) development at this site within the townlands of Coom (Hudson), Mullenaboree, Knockaunalour, Knocknacaheragh, Chimneyfield, Killeagh, Glannasack, Knockdoorty and Lackendarragh North, Co. Cork The Renewable Energy Development (RED III) will consist of: • Installation of approximately 15.8 km of underground medium voltage (33kV) electrical and communication cabling between the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) and all associated ancillary works; • Forestry felling of 13 ha to facilitate construction and operation of the Proposed Development; and • All associated infrastructure, services and site works including excavation, earthworks, soil management, drainage and sediment control to facilitate the works. • A 10-year planning permission is being sought for the construction of the Proposed Development, alongside an operational period of 30 years. The underground cabling is intended to connect the western and eastern arrays of the permitted Coom Green Energy Park (ACP Ref: 04.308885) to the proposed 110kV onsite substation at Lackendarragh North which is the subject of a separate application for consent to An Coimisiún Pleanála. This separate consent application includes the proposed onsite 110 kV substation at Lackendarragh North and associated works including 110 kV underground grid connection cabling between Lackendarragh North and the existing 110 kV Barrymore substation at Kill-Saint-Anne-North, Co. Cork. Coom Green Energy Park along with its grid connection was previously subject to EIA pursuant to planning ref. ACP Ref: 04.308885. The EIAR submitted with this application for consent assesses the entire project which includes all infrastructure associated with both applications for planning consent including the permitted Coom Green Energy Park. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the Application.

AuthorityCork County Council
Reference26/2424
StatusChecked 26 Sep 2026
Open official record