Planning lead, AN CHARRAIG, NA DOIRÍ BEAGA, LEITIR CEANAINN
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL DUAL BAY CABINET, PALISADE FENCING TO MATCH EXISTING GATE FENCING, CONCRETE PLINTH AND ALL OTHER ASSOCIATED DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 7 Feb 2025. / Confidence: LowDecision date 7 Feb 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL DUAL BAY CABINET, PALISADE FENCING TO MATCH EXISTING GATE FENCING, CONCRETE PLINTH AND ALL OTHER ASSOCIATED DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2462023
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Planning record
The public application record identifies planning record in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL DUAL BAY CABINET, PALISADE FENCING TO MATCH EXISTING GATE FENCING, CONCRETE PLINTH AND ALL OTHER ASSOCIATED DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Application to site progress
-
Applied 9 Dec 2024 2462023
-
Decision Conditional 7 Feb 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2462023
INSTALLATION OF A 12-METRE STOUT WOODEN UTILITY POLE WITH 1 NO. RECEIVING DISH, A GROUND-LEVEL DUAL BAY CABINET, PALISADE FENCING TO MATCH EXISTING GATE FENCING, CONCRETE PLINTH AND ALL OTHER ASSOCIATED DEVELOPMENT. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Open official record