Mixed use, LILY'S BAR, CARROWMORE, MALIN LIFFORD PO
DEVELOPMENT OF A ‘VISIT MALIN - EXPERIENCE CENTRE’ CONSISTING OF (1) DEMOLITION OF REAR SINGLE STOREY EXTENSION OF LILY’S BAR INCLUDING THE REAR BOUNDARY WALL ALONG THE NORTH-EAST BOUNDARY, (2) CONSTRUCTION OF (A) A NEW TWO-STORY EXTENSION TO INCLUDE ATRIUM AND MEZZANINE TO THE REAR OF LILY’S BAR TO LINK THE FRONT BUILDING AND...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
DEVELOPMENT OF A ‘VISIT MALIN - EXPERIENCE CENTRE’ CONSISTING OF (1) DEMOLITION OF REAR SINGLE STOREY EXTENSION OF LILY’S BAR INCLUDING THE REAR BOUNDARY WALL ALONG THE NORTH-EAST BOUNDARY, (2) CONSTRUCTION OF (A) A NEW TWO-STORY EXTENSION TO INCLUDE ATRIUM AND MEZZANINE TO THE REAR OF LILY’S BAR TO LINK THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1) AND (B) A TWO-STOREY LINK AT THE CORNER OF THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1), (3) INTERNAL RENOVATIONS TO GROUND AND FIRST FLOORS...
Named firms
Public source roles
- Paddy Doherty, of Glackin Taverns Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2661673
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Mixed use
The public application record identifies mixed use in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Paddy Doherty, of Glackin Taverns Ltd
- Planning agent
- Care of Declan McCabe
- Agent address
- OLD LAGHEY ROAD DONEGAL TOWN CO. DONEGAL F94 RX63
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
DEVELOPMENT OF A ‘VISIT MALIN - EXPERIENCE CENTRE’ CONSISTING OF (1) DEMOLITION OF REAR SINGLE STOREY EXTENSION OF LILY’S BAR INCLUDING THE REAR BOUNDARY WALL ALONG THE NORTH-EAST BOUNDARY, (2) CONSTRUCTION OF (A) A NEW TWO-STORY EXTENSION TO INCLUDE ATRIUM AND MEZZANINE TO THE REAR OF LILY’S BAR TO LINK THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1) AND (B) A TWO-STOREY LINK AT THE CORNER OF THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1), (3) INTERNAL RENOVATIONS TO GROUND AND FIRST FLOORS RESPECTIVELY TO RETAIN LILY’S BAR, PROVISION OF A CAFE AND ASSOCIATED KITCHEN SPACE, PROVISION OF RETAIL AREAS, MULTIMEDIA ROOMS AND GALLERY SPACES, TOILETS AND STORAGE SPACES, (4) RAISING THE EAVES AND RIDGE LEVEL OF SOUTHERN BUILDING ALONG R-243-1, (5) ELEVATIONAL CHANGES TO ALL SIDES, (6) PROVISION OF SIGNAGE AND ASSOCIATED LIGHTING TO ALL ELEVATIONS AND (7) CONNECTION TO ALL EXISTING ON-SITE SERVICES ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
Application to site progress
-
Applied 8 Sep 2026 2661673
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2661673
DEVELOPMENT OF A ‘VISIT MALIN - EXPERIENCE CENTRE’ CONSISTING OF (1) DEMOLITION OF REAR SINGLE STOREY EXTENSION OF LILY’S BAR INCLUDING THE REAR BOUNDARY WALL ALONG THE NORTH-EAST BOUNDARY, (2) CONSTRUCTION OF (A) A NEW TWO-STORY EXTENSION TO INCLUDE ATRIUM AND MEZZANINE TO THE REAR OF LILY’S BAR TO LINK THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1) AND (B) A TWO-STOREY LINK AT THE CORNER OF THE FRONT BUILDING AND SIDE BUILDING (ALONG R-243-1), (3) INTERNAL RENOVATIONS TO GROUND AND FIRST FLOORS RESPECTIVELY TO RETAIN LILY’S BAR, PROVISION OF A CAFE AND ASSOCIATED KITCHEN SPACE, PROVISION OF RETAIL AREAS, MULTIMEDIA ROOMS AND GALLERY SPACES, TOILETS AND STORAGE SPACES, (4) RAISING THE EAVES AND RIDGE LEVEL OF SOUTHERN BUILDING ALONG R-243-1, (5) ELEVATIONAL CHANGES TO ALL SIDES, (6) PROVISION OF SIGNAGE AND ASSOCIATED LIGHTING TO ALL ELEVATIONS AND (7) CONNECTION TO ALL EXISTING ON-SITE SERVICES ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
Open official record