Save this project to account
Granted · decision due 22 Sep 2026Decision recorded

Residential development, Symphony House, Adelaide Road, Dublin 2

Dublin 2, Dublin · Dublin City Council · Plan 2425/21/X1 · PB ref PB-2040932727

EXT. OF DURATION: The development will consist of works to bring the existing building into compliance with a proposed regularised fire safety certificate, including the creation of three new openings to the external wall for automatic openings vents (AOVs) and the replacement of four number existing windows with AOVs to the...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 22 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 21 Sep 2026. / Confidence: Low
Decision GRANT EXT. OF DURATION OF PERMISSION

Decision date 21 Sep 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

EXT. OF DURATION: The development will consist of works to bring the existing building into compliance with a proposed regularised fire safety certificate, including the creation of three new openings to the external wall for automatic openings vents (AOVs) and the replacement of four number existing windows with AOVs to the West elevation of the apartment block (all AOVs are to be opaque), the installation of an AOV over the staircase at roof level and the installation of a vent from a smoke extract system on...

Ref 2425/21/X1 Source-linked Official application description for exact planning reference 2425/21/X1
Open scope evidence

Public source roles

Symphony House CLG Care of Wyse Property Management Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.
Woolpert Surveying Ireland Ltd
Planning agent named on the public planning record
Submission role only; current appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
Dublin City Council
Exact reference
2425/21/X1
Evidence reviewed
27 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Small residential

Small residential

The public application record identifies small residential in the submitted planning scope.

2425/21/X1Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Symphony House CLG Care of Wyse Property Management Ltd
Planning agent
Woolpert Surveying Ireland Ltd
Official description

Application text

EXT. OF DURATION: The development will consist of works to bring the existing building into compliance with a proposed regularised fire safety certificate, including the creation of three new openings to the external wall for automatic openings vents (AOVs) and the replacement of four number existing windows with AOVs to the West elevation of the apartment block (all AOVs are to be opaque), the installation of an AOV over the staircase at roof level and the installation of a vent from a smoke extract system on the south elevation at basement level.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2425/21/X1

EXT. OF DURATION: The development will consist of works to bring the existing building into compliance with a proposed regularised fire safety certificate, including the creation of three new openings to the external wall for automatic openings vents (AOVs) and the replacement of four number existing windows with AOVs to the West elevation of the apartment block (all AOVs are to be opaque), the installation of an AOV over the staircase at roof level and the installation of a vent from a smoke extract system on the south elevation at basement level.

AuthorityDublin City Council
Reference2425/21/X1
StatusChecked 27 Sep 2026
Open official record