Temporary/event, Saint Aidan's CBS, Collins Avenue Extension, Whitehall, Dublin...
1. The demolition of the 730 sq.m annex temporary classroom block to the front of the school, comprising of 9 classrooms, 4 SET rooms, caretaker rooms and project art store. 2. The construction of the new standalone 4,055 sq.m extension and external link to St. Aidan's C.B.S. Secondary School. The building height varies from 2...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 30 Sep 2024. / Confidence: LowDecision date 30 Sep 2024.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
1. The demolition of the 730 sq.m annex temporary classroom block to the front of the school, comprising of 9 classrooms, 4 SET rooms, caretaker rooms and project art store. 2. The construction of the new standalone 4,055 sq.m extension and external link to St. Aidan's C.B.S. Secondary School. The building height varies from 2 to 3 storey. Accommodation provides for 4 Classroom Special Education Needs Unit with all associated facilities, 15 General Classrooms, 5 SET rooms, 2 Science Laboratories with associated...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- 3635/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
1. The demolition of the 730 sq.m annex temporary classroom block to the front of the school, comprising of 9 classrooms, 4 SET rooms, caretaker rooms and project art store. 2. The construction of the new standalone 4,055 sq.m extension and external link to St. Aidan's C.B.S. Secondary School. The building height varies from 2 to 3 storey. Accommodation provides for 4 Classroom Special Education Needs Unit with all associated facilities, 15 General Classrooms, 5 SET rooms, 2 Science Laboratories with associated preparation room, 1 music room, 1 Constructions studies room with associated prep room and project store, 1 Art room with associated project store, 1 Design, Communications and Graphics room, 1 multimedia room, 1 Staff room, ancillary accommodation and circulation. 3. Two new pedestrian access gates from Collins Avenue and two reconstructed vehicular gates on Collins Avenue and Falcarragh Road. 4. New Signage comprising of a wall mounted metal signage above the main building entrance. 5. Relocation of 348 cycle spaces and 50 no. car parking spaces. 6. All associated ancillary site development and landscaping works.
Application to site progress
-
Applied 3 May 2024 3635/24
-
Decision Grant Permission 30 Sep 2024
-
Appeal Grant permission with revised conditions 321083 / 24 Feb 2025
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 3635/24
1. The demolition of the 730 sq.m annex temporary classroom block to the front of the school, comprising of 9 classrooms, 4 SET rooms, caretaker rooms and project art store. 2. The construction of the new standalone 4,055 sq.m extension and external link to St. Aidan's C.B.S. Secondary School. The building height varies from 2 to 3 storey. Accommodation provides for 4 Classroom Special Education Needs Unit with all associated facilities, 15 General Classrooms, 5 SET rooms, 2 Science Laboratories with associated preparation room, 1 music room, 1 Constructions studies room with associated prep room and project store, 1 Art room with associated project store, 1 Design, Communications and Graphics room, 1 multimedia room, 1 Staff room, ancillary accommodation and circulation. 3. Two new pedestrian access gates from Collins Avenue and two reconstructed vehicular gates on Collins Avenue and Falcarragh Road. 4. New Signage comprising of a wall mounted metal signage above the main building entrance. 5. Relocation of 348 cycle spaces and 50 no. car parking spaces. 6. All associated ancillary site development and landscaping works.
Open official record