Save this project to account
GrantedProtected structureDecision recorded

Protected structure, Church of Saint Peter, North Circular Road, Phibsborough...

Dublin 7, Dublin · Dublin City Council · Plan 4339/24 · PB ref PB-10000194746

PROTECTED STRUCTURE The development will consist of the refurbishment, services upgrade and re- ordering of the church interior, a protected structure. Works include removal of existing floor slab, floor finishes and building services, upgrade of life safety systems and M&E services; new stone predella with access ramp, altar...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision 3 Dec 2024 public planning date
Commenced 8 Dec 2025 public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Site activity evidenced

A linked public commencement record can signal site-stage demand. It does not confirm that any package remains unawarded or publish a procurement date.

8 Dec 2025 / CN0136492DC / Confidence: Medium
Decision GRANT PERMISSION

Decision date 3 Dec 2024.

Commencement activity Official activity indexed

8 Dec 2025 / CN0136492DC

High for recorded activity
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

PROTECTED STRUCTURE The development will consist of the refurbishment, services upgrade and re- ordering of the church interior, a protected structure. Works include removal of existing floor slab, floor finishes and building services, upgrade of life safety systems and M&E services; new stone predella with access ramp, altar & lecterns, fixed seating; new floor slab and floor finishes with underfloor heating, new access ramps; reinstatement of stained glass window, new room with glazed screens; new tea station...

Ref 4339/24 Source-linked Official application description for exact planning reference 4339/24

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Dublin City Council
Exact reference
4339/24
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Protected structure

Protected structure

The public application record identifies protected structure in the submitted planning scope.

4339/24Explicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

4339/24Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

4339/24Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

PROTECTED STRUCTURE The development will consist of the refurbishment, services upgrade and re- ordering of the church interior, a protected structure. Works include removal of existing floor slab, floor finishes and building services, upgrade of life safety systems and M&E services; new stone predella with access ramp, altar & lecterns, fixed seating; new floor slab and floor finishes with underfloor heating, new access ramps; reinstatement of stained glass window, new room with glazed screens; new tea station and accessible WC and lobby using existing drainage; pews and railings refurbished; surplus pews put in storage; repository relocated, new protective glazing to stained glass windows; new handrails to sanctuary; general cleaning and redecoration of surfaces; miscellaneous conservation repairs.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
PlanningCouncil planning register
  1. Applied 11 Oct 2024 4339/24
  2. Decision Grant Permission 3 Dec 2024
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced 8 Dec 2025 CN0136492DC
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 4339/24

PROTECTED STRUCTURE The development will consist of the refurbishment, services upgrade and re- ordering of the church interior, a protected structure. Works include removal of existing floor slab, floor finishes and building services, upgrade of life safety systems and M&E services; new stone predella with access ramp, altar & lecterns, fixed seating; new floor slab and floor finishes with underfloor heating, new access ramps; reinstatement of stained glass window, new room with glazed screens; new tea station and accessible WC and lobby using existing drainage; pews and railings refurbished; surplus pews put in storage; repository relocated, new protective glazing to stained glass windows; new handrails to sanctuary; general cleaning and redecoration of surfaces; miscellaneous conservation repairs.

AuthorityDublin City Council
Reference4339/24
StatusChecked 2 Jun 2026
Open official record