Energy, Newtown, North Road, Co. Dublin
The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 13 Nov 2026; no procurement timetable is published.
Decision due 13 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS units (4.2 m H × 2.7 m W × 7.6 m L); 9 MV stations (2.8 m H × 2.2 m W × 8.6 m L); Design Layout 1 (Drawing No. 24052-202). • Technology Option 2: 18 BESS units (4.2 m H × 2.5 m W × 6.1 m L); 9...
Open scope evidenceNamed firms
Public source roles
- Coldwinters Energy Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Fingal County Council
- Exact reference
- FW26A/0358E
- Evidence reviewed
- 25 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Coldwinters Energy Ltd
- Planning agent
- Eimear O'Brien
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS units (4.2 m H × 2.7 m W × 7.6 m L); 9 MV stations (2.8 m H × 2.2 m W × 8.6 m L); Design Layout 1 (Drawing No. 24052-202). • Technology Option 2: 18 BESS units (4.2 m H × 2.5 m W × 6.1 m L); 9 MV stations (2.9 m H × 2.5 m W × 6.1 m L); Design Layout 2 (Drawing No. 24052-203). • Technology Option 3: 16 BESS units (3.2 m H × 2.5 m W × 6.1 m L); 2 MV stations (2.9 m H × 2.5 m W × 12.2 m L); Design Layout 3 (Drawing No. 24052-204) Construction elements for the proposed project include: • Site access track, hardstanding area, foundations for the Battery Energy Storage System (BESS) and Medium Voltage (MV) stations, BESS switch room building, control building, welfare and spare parts building, 38kV transformer and associated bund, earth and Low Voltage (LV) transformer, Distribution System Operator (DSO) substation, associated drainage infrastructure, and all ancillary works; • Installation of BESS units and MV stations; installation of underground power and communications cables between the BESS, MV stations, DSO substation, and control building; • Construction, use, and decommissioning of a temporary site compound to facilitate the works, along with the construction of a new site entrance; • Provision of a grid connection route from the DSO substation to the Finglas 220/38kV substation; and • All associated site works, including site clearance, ancillary development (such as site drainage), installation of security gates and fencing, permanent and temporary signage. The proposed site will be used as a single purpose site as a BESS facility, supporting the decarbonisation of the electrical grid. Permission is sought for the proposed development for a period of 10 years, with an operational period of 40 years.
Application to site progress
-
Applied 21 Sep 2026 FW26A/0358E
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale FW26A/0358E
The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS units (4.2 m H × 2.7 m W × 7.6 m L); 9 MV stations (2.8 m H × 2.2 m W × 8.6 m L); Design Layout 1 (Drawing No. 24052-202). • Technology Option 2: 18 BESS units (4.2 m H × 2.5 m W × 6.1 m L); 9 MV stations (2.9 m H × 2.5 m W × 6.1 m L); Design Layout 2 (Drawing No. 24052-203). • Technology Option 3: 16 BESS units (3.2 m H × 2.5 m W × 6.1 m L); 2 MV stations (2.9 m H × 2.5 m W × 12.2 m L); Design Layout 3 (Drawing No. 24052-204) Construction elements for the proposed project include: • Site access track, hardstanding area, foundations for the Battery Energy Storage System (BESS) and Medium Voltage (MV) stations, BESS switch room building, control building, welfare and spare parts building, 38kV transformer and associated bund, earth and Low Voltage (LV) transformer, Distribution System Operator (DSO) substation, associated drainage infrastructure, and all ancillary works; • Installation of BESS units and MV stations; installation of underground power and communications cables between the BESS, MV stations, DSO substation, and control building; • Construction, use, and decommissioning of a temporary site compound to facilitate the works, along with the construction of a new site entrance; • Provision of a grid connection route from the DSO substation to the Finglas 220/38kV substation; and • All associated site works, including site clearance, ancillary development (such as site drainage), installation of security gates and fencing, permanent and temporary signage. The proposed site will be used as a single purpose site as a BESS facility, supporting the decarbonisation of the electrical grid. Permission is sought for the proposed development for a period of 10 years, with an operational period of 40 years.