Commercial fit-out, JFK Enterprise Centre, Bluebell, Dublin 12, D12 F229.
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A linked public commencement record can signal site-stage demand. It does not confirm that any package remains unawarded or publish a procurement date.
17 Jan 2025 / CN0124708SD / Confidence: MediumDecision date 5 Nov 2024.
Open evidence17 Jan 2025 / CN0124708SD
High for recorded activityNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is laid around the main building 4) Erecting company signage on the main building overall size 0.9m x 18.75m 5) Add 19 No. street lights within the company forecourt 6) Install two electric gates...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 1 official source
- Authority
- South Dublin County Council
- Exact reference
- SD24A/0145W
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Commercial fit-out
The public application record identifies commercial fit-out in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is laid around the main building 4) Erecting company signage on the main building overall size 0.9m x 18.75m 5) Add 19 No. street lights within the company forecourt 6) Install two electric gates 7) Add metal lines above the roof of the main building 8) Repainting exterior wall paint 9) Replace all doors and windows of the main building, the outer frame color of doors and windows is gun grey 10) On the southeast side of the main building, establish a 4700mm wide and 3100mm high billboard.
Application to site progress
-
Applied 9 Oct 2024 SD24A/0145W
-
Decision Grant Permission 5 Nov 2024
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced 17 Jan 2025 CN0124708SD
-
Completed Completion certificate recorded CC00000061911SD · commencement CN0124708SD · recorded in Jan 2025 The month is when the certificate appeared in the indexed source, not a separate completion date. The source does not state whether this is full or partial completion. Completion evidence projection checked 31 Jul 2026.
Source, scope and limits
Application description and scale SD24A/0145W
1) The erection of a 2.3m high black palisade fence to the north, east and part of the west boundaries 2) Remove the foyer and rebuild a new one: a sloping roof with a height not exceeding 3380mm, a width of 3680mm, and a depth of 2630mm 3) Within the company courtyard, approximately 700 square meters of asphalt pavement is laid around the main building 4) Erecting company signage on the main building overall size 0.9m x 18.75m 5) Add 19 No. street lights within the company forecourt 6) Install two electric gates 7) Add metal lines above the roof of the main building 8) Repainting exterior wall paint 9) Replace all doors and windows of the main building, the outer frame color of doors and windows is gun grey 10) On the southeast side of the main building, establish a 4700mm wide and 3100mm high billboard.
Open official record