Development Description
Retention Planning Permission for the following as built alterations (previously granted layout Ref. No. SD20A/0095): (I) Change of use from Store Areas and Stairs Access to First Floor Level to Retail Area. (ii) Change of use from previously permitted Seating Area to Stores Area, relocated stairs to First Floor Store and public toilets accessed from the Retail Area. (iii) As constructed layout of Offices and Strong Room. (iv) As constructed lift to First Floor Store. (v) Increase in size of permitted Post Office Unit. (vi) Change of use from Retail Area to Seating Area. (vii) New Fire Escape Door on the Northern Elevation. (viii) Relocation of the existing fire escape door on the Eastern Elevation. (ix) As Constructed Canopy for the "Click and collect" facility on the Eastern side of the SuperValu Unit. (x) Relocation of the existing fire escape door and omission of the part of the Glazing permitted on the Southern Elevation. (xi) First Floor External cladding on the Southern and Western Elevation. (xii) Additional Cladding on the Western Facade of the Shopping Centre. (xiii) As constructed mono pitched glazed wind barrier on the Western side of the Entrance Tower to the Supervalu Unit. (xiv) As constructed location of the Trolley Bay on the on the Western side of the Entrance Tower to the Supervalu Unit.
Map
No coordinates supplied in the public planning feed.