Commercial new build, Stanhope Centre, Grangegorman Lower, Dublin 7, D07 X8R6
The development will consist of: (1) Refurbishment works to existing Health Clinic and Medical Consultants' Suites to be comprised of changes to internal layout at ground floor level to provide 2 no. clinic and 4 no. Medical Consultant Suites (265 m²), at first floor level to provide Medical Consultants' Suites (190 m²), and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 16 Apr 2025. / Confidence: LowDecision date 16 Apr 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will consist of: (1) Refurbishment works to existing Health Clinic and Medical Consultants' Suites to be comprised of changes to internal layout at ground floor level to provide 2 no. clinic and 4 no. Medical Consultant Suites (265 m²), at first floor level to provide Medical Consultants' Suites (190 m²), and all associated elevational changes; (2) New accessible public side entrance with ramp and canopy; (3) Provision of waste storage facilities at ground floor level; (4) Removal of existing oil...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Dublin City Council
- Exact reference
- WEB2684/24
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Commercial new build
The public application record identifies commercial new build in the submitted planning scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Dublin planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will consist of: (1) Refurbishment works to existing Health Clinic and Medical Consultants' Suites to be comprised of changes to internal layout at ground floor level to provide 2 no. clinic and 4 no. Medical Consultant Suites (265 m²), at first floor level to provide Medical Consultants' Suites (190 m²), and all associated elevational changes; (2) New accessible public side entrance with ramp and canopy; (3) Provision of waste storage facilities at ground floor level; (4) Removal of existing oil tank and replacement with external heat pump and associated plant at ground floor level; (5) Addition of new PV panel solar mounting system to existing roof; (6) And all associated ancillary site works and services.
Application to site progress
-
Applied 10 Dec 2024 WEB2684/24
-
Decision Grant Permission 16 Apr 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale WEB2684/24
The development will consist of: (1) Refurbishment works to existing Health Clinic and Medical Consultants' Suites to be comprised of changes to internal layout at ground floor level to provide 2 no. clinic and 4 no. Medical Consultant Suites (265 m²), at first floor level to provide Medical Consultants' Suites (190 m²), and all associated elevational changes; (2) New accessible public side entrance with ramp and canopy; (3) Provision of waste storage facilities at ground floor level; (4) Removal of existing oil tank and replacement with external heat pump and associated plant at ground floor level; (5) Addition of new PV panel solar mounting system to existing roof; (6) And all associated ancillary site works and services.
Open official record