Infrastructure, Killeroran Tullyroe Tully Srahaunnagort (or Thornfield) and...
for decommissioning and removal from the site of the existing steel modular site welfare unit 23 m², tanks, pipework, existing boundary fence and all other associated clearance works; construction of a new below-ground storm water tank along with all associated ancillary equipment; construction of a new below-ground circular...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 21 Jan 2025. / Confidence: LowDecision date 21 Jan 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for decommissioning and removal from the site of the existing steel modular site welfare unit 23 m², tanks, pipework, existing boundary fence and all other associated clearance works; construction of a new below-ground storm water tank along with all associated ancillary equipment; construction of a new below-ground circular primary settling tank; construction of a new stormwater overflow outfall from the proposed stormwater tank discharging to Ballygar Stream; construction of a new below ground forward feed...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Galway County Council
- Exact reference
- 2460474
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Galway planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for decommissioning and removal from the site of the existing steel modular site welfare unit 23 m², tanks, pipework, existing boundary fence and all other associated clearance works; construction of a new below-ground storm water tank along with all associated ancillary equipment; construction of a new below-ground circular primary settling tank; construction of a new stormwater overflow outfall from the proposed stormwater tank discharging to Ballygar Stream; construction of a new below ground forward feed pumping station downstream of the proposed primary settling tank to lift flows to the proposed trickling filter splitter chamber; construction of 2 no. new below-ground final settlement tanks, ; construction of 6 no. new sludge drying reed beds (SDRB); provision of 2 no. new progressive cavity pumps. Construction of a new below-ground SDRB and sludge recirculation pump sump; construction of a new below-ground final effluent pumping station and approximately 2.5km of rising main and approximately 328m of 225mm gravity sewer network and associated manholes and headwall for discharge to the River Suck; and construction of a control building to include a laboratory, workshop/storage room, control room, toilets and kitchenette of approximately 123 m² and approximately 5m in height with up to approximately 62 m² of roof mounted solar panels. All associated works including all associated interconnecting above and below ground pipework, valves, telemetry, plant and equipment, construction of an internal access road, 3 no. parking spaces, EV charge point, replacement of existing security fencing with new security fencing of 2.4m high green steel palisade fence, generator with integrated fuel storage tank, lighting columns of maximum height 6m and landscaping. This application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 123 m². Gross floor space of any demolition: 23 m²
Application to site progress
-
Applied 29 Apr 2024 2460474
-
Decision Conditional 21 Jan 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460474
for decommissioning and removal from the site of the existing steel modular site welfare unit 23 m², tanks, pipework, existing boundary fence and all other associated clearance works; construction of a new below-ground storm water tank along with all associated ancillary equipment; construction of a new below-ground circular primary settling tank; construction of a new stormwater overflow outfall from the proposed stormwater tank discharging to Ballygar Stream; construction of a new below ground forward feed pumping station downstream of the proposed primary settling tank to lift flows to the proposed trickling filter splitter chamber; construction of 2 no. new below-ground final settlement tanks, ; construction of 6 no. new sludge drying reed beds (SDRB); provision of 2 no. new progressive cavity pumps. Construction of a new below-ground SDRB and sludge recirculation pump sump; construction of a new below-ground final effluent pumping station and approximately 2.5km of rising main and approximately 328m of 225mm gravity sewer network and associated manholes and headwall for discharge to the River Suck; and construction of a control building to include a laboratory, workshop/storage room, control room, toilets and kitchenette of approximately 123 m² and approximately 5m in height with up to approximately 62 m² of roof mounted solar panels. All associated works including all associated interconnecting above and below ground pipework, valves, telemetry, plant and equipment, construction of an internal access road, 3 no. parking spaces, EV charge point, replacement of existing security fencing with new security fencing of 2.4m high green steel palisade fence, generator with integrated fuel storage tank, lighting columns of maximum height 6m and landscaping. This application is accompanied by a Natura Impact Statement. Gross floor space of proposed works: 123 m². Gross floor space of any demolition: 23 m²
Open official record