Telecoms, Cloonascragh, Tuam, Co. Galway
for a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300 m² enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140 m², (iii) a 110kV electricity...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 26 Mar 2025. / Confidence: LowDecision date 26 Mar 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300 m² enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140 m², (iii) a 110kV electricity transformer, with associated equipment including cable sealing end, surge arrestor, earth disconnect, current/voltage transformer, house transformer, circuit breaker and lightning mast, (iv) a...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Galway County Council
- Exact reference
- 2560096
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Telecoms
The public application record identifies telecoms in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Galway planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300 m² enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140 m², (iii) a 110kV electricity transformer, with associated equipment including cable sealing end, surge arrestor, earth disconnect, current/voltage transformer, house transformer, circuit breaker and lightning mast, (iv) a diesel generator for emergency lighting, (v) the upgrade of an existing access point from the L6141 and the construction of approximately 130m of access track, (vi) underground electrical and communications cabling, (vii) underground electrical cable connecting the transformer compound to the electrical cable permitted as part of the Tuam Energy Park (Galway County Council Planning Register Reference 20/1387) and (viii) all associated and ancillary site development, landscaping and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application
Application to site progress
-
Applied 31 Jan 2025 2560096
-
Decision Conditional 26 Mar 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560096
for a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300 m² enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140 m², (iii) a 110kV electricity transformer, with associated equipment including cable sealing end, surge arrestor, earth disconnect, current/voltage transformer, house transformer, circuit breaker and lightning mast, (iv) a diesel generator for emergency lighting, (v) the upgrade of an existing access point from the L6141 and the construction of approximately 130m of access track, (vi) underground electrical and communications cabling, (vii) underground electrical cable connecting the transformer compound to the electrical cable permitted as part of the Tuam Energy Park (Galway County Council Planning Register Reference 20/1387) and (viii) all associated and ancillary site development, landscaping and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the application
Open official record