Infrastructure, Leitir, Moycullen, Co. Galway
for the proposed development will consist of amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641 and 24/61485). The amendments comprise revised underground cabling connection to a new 110kV electrical compound, with perimeter fencing, 1 no. control building, associated...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 18 Jun 2025. / Confidence: LowDecision date 18 Jun 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for the proposed development will consist of amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641 and 24/61485). The amendments comprise revised underground cabling connection to a new 110kV electrical compound, with perimeter fencing, 1 no. control building, associated electrical plant and apparatus and 110kV underground cabling connection to the existing Knockranny substation and all associated works. A Natura Impact Statement (NIS) has been prepared in...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Galway County Council
- Exact reference
- 2560575
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Galway planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for the proposed development will consist of amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641 and 24/61485). The amendments comprise revised underground cabling connection to a new 110kV electrical compound, with perimeter fencing, 1 no. control building, associated electrical plant and apparatus and 110kV underground cabling connection to the existing Knockranny substation and all associated works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Is éard a bheidh san fhorbairt bheartaithe ná leasuithe ar Chomhdhlúthadán Sioncronach na nArd-doiriú ceadaithe (Uimhir Thagartha 23/60641 agus 24/61485 ó Chomhairle Contae na Gaillimhe). Is éard atá sna leasuithe ná nasc cáblaithe faoi thalamh athbhreithnithe go dtí cumaisc leictreach 110kV nua, le fál imlíneach, 1 uimh. foirgneamh rialaithe, fearas agus gaireas leictreach gaolmhar agus nasc cáblaithe 110kV faoi thalamh go dtí fostáisiún reatha Chnoc Raithní agus na hoibreacha gaolmhara go léir. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe. Gross floor space of proposed works: 179.31 m²
Application to site progress
-
Applied 12 May 2025 2560575
-
Decision Conditional 18 Jun 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560575
for the proposed development will consist of amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641 and 24/61485). The amendments comprise revised underground cabling connection to a new 110kV electrical compound, with perimeter fencing, 1 no. control building, associated electrical plant and apparatus and 110kV underground cabling connection to the existing Knockranny substation and all associated works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Is éard a bheidh san fhorbairt bheartaithe ná leasuithe ar Chomhdhlúthadán Sioncronach na nArd-doiriú ceadaithe (Uimhir Thagartha 23/60641 agus 24/61485 ó Chomhairle Contae na Gaillimhe). Is éard atá sna leasuithe ná nasc cáblaithe faoi thalamh athbhreithnithe go dtí cumaisc leictreach 110kV nua, le fál imlíneach, 1 uimh. foirgneamh rialaithe, fearas agus gaireas leictreach gaolmhar agus nasc cáblaithe 110kV faoi thalamh go dtí fostáisiún reatha Chnoc Raithní agus na hoibreacha gaolmhara go léir. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe. Gross floor space of proposed works: 179.31 m²
Open official record