Granted · decision due 2 Sep 2026Protected structureDecision recorded

Protected structure, Gort Ard, Rockbarton North, Salthill, Galway, Co. Galway

Salthill, Galway · Galway City Council · Plan FS10026 · PB ref PB-2772597292

Submission No. 3045178 - Refurbishment and extension of existing 3-storey (2-storey over basement) 'Gort Ard' House (A Protected Structure RPS No. 8701) and associated existing 2-storey annex building (total existing GFA approx. 686.7 sq m) to provide for the upgrade of existing facilities and services offered on site...

Indicative value €1m–3m PB indicative band
Units applied for Not listed public application record
Floor area 2,046 m² published reliable figure
Decision due 2 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Protected structure

The protected-structure designation is source evidence and can shape specification and method.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 3 Sep 2026. / Confidence: Low
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Submission No. 3045178 - Refurbishment and extension of existing 3-storey (2-storey over basement) 'Gort Ard' House (A Protected Structure RPS No. 8701) and associated existing 2-storey annex building (total existing GFA approx. 686.7 sq m) to provide for the upgrade of existing facilities and services offered on site including provision for: (a) new student accommodation (16 no. ensuite bedrooms with an overall proposed capacity of 18 no. bed spaces); (b) private residential accommodation for resident Gord Ard...

Ref FS10026 Source-linked Official application description for exact planning reference FS10026
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

2 packages
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

FS10026 Explicit description / Source-linked Source
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

FS10026 Explicit description / Source-linked Source
Confidence & provenance 1 official source
Authority
Galway City Council
Exact reference
FS10026
Evidence reviewed
17 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Protected structure

Protected structure

The public application record identifies protected structure in the submitted planning scope.

FS10026Explicit application record
Conservation

Protected-structure / conservation scope

The public application description explicitly references protected-structure / conservation scope.

FS10026Explicit description signal
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

FS10026Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Mr Luison Lassala
Planning agent
McArdle Doyle
Agent address
Chartered Engineers Architects and Project Managers Second Floor, Exchange Building, The Long Walk Dundalk, Co. Louth
Official description

Application text

Submission No. 3045178 - Refurbishment and extension of existing 3-storey (2-storey over basement) 'Gort Ard' House (A Protected Structure RPS No. 8701) and associated existing 2-storey annex building (total existing GFA approx. 686.7 sq m) to provide for the upgrade of existing facilities and services offered on site including provision for: (a) new student accommodation (16 no. ensuite bedrooms with an overall proposed capacity of 18 no. bed spaces); (b) private residential accommodation for resident Gord Ard House management and guests (4 no. ensuite bed rooms with 4 no. bed spaces); (c) a new oratory; (d) a new multipurpose building; and (e) all ancillary areas and works (total new GFA approx. 1,278.37 sq m). The development works will include: • The demolition of an existing link building (approx. 81 m²), removal of an external wall planter and partial removal of an existing stone wall to facilitate the new development proposal; • The refurbishment and renovation of 'Gort Ard' House (A Protected Structure RPS No. 8701) to include dining space, kitchen and hot press, servery, pantry, hall pantry, staff changing and social area, cleaner store, hall, WCs, storage, cloak room, entrance lobby, lobby, conference room, visitor room, day room, directors office, comms rooms, visitor WC, 1 no. ensuite student bedroom and 4 no. resident bed rooms and all circulation areas across the lower ground floor, upper ground floor and first floor levels (3 storeys). • The refurbishment of the existing annex building to include 9 no. ensuite student bedrooms at lower ground and ground floor level (2 storeys). • A new side extension (predominantly 2 storeys with 3 storey element to accommodate a new lift) linking the newly refurbished Gort Ard house and the Annex building to include 1 no. ensuite student bedroom, lounge, plant room, utility, drying press, accessible WC, washing/laundry area, ironing and laundry area, lobbies, lift and service riser at lower ground floor level. A new oratory at upper ground floor level to including sacristy, confessional box, lobbies, store, lift and service riser. • A new multipurpose building (2 storey) including 2 no. multipurpose rooms, shower facilities and toilets at lower ground floor level and 5 no. ensuite student bedrooms, lobbies and corridors at upper ground floor level. • A new link and extension between the newly refurbished annex building and new multipurpose building (2 storeys). • Primary vehicular access to Gord Ard is maintained via the existing main entrance to the site and revisions to the existing secondary service access are proposed to facilitate the new extension and associated new service arrangements for the building. • Bin Refuse Storage Areas and designated Bicycle Shelters providing for 20 secured and sheltered spaces plus 12 no. visitor bicycle spaces. • New external courtyard area with high quality hard and soft landscaping features. • All associated site development works including all landscaping and site service work at Gort Ard House, Rockbarton North, Salthill, Galway.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale FS10026

Submission No. 3045178 - Refurbishment and extension of existing 3-storey (2-storey over basement) 'Gort Ard' House (A Protected Structure RPS No. 8701) and associated existing 2-storey annex building (total existing GFA approx. 686.7 sq m) to provide for the upgrade of existing facilities and services offered on site including provision for: (a) new student accommodation (16 no. ensuite bedrooms with an overall proposed capacity of 18 no. bed spaces); (b) private residential accommodation for resident Gord Ard House management and guests (4 no. ensuite bed rooms with 4 no. bed spaces); (c) a new oratory; (d) a new multipurpose building; and (e) all ancillary areas and works (total new GFA approx. 1,278.37 sq m). The development works will include: • The demolition of an existing link building (approx. 81 m²), removal of an external wall planter and partial removal of an existing stone wall to facilitate the new development proposal; • The refurbishment and renovation of 'Gort Ard' House (A Protected Structure RPS No. 8701) to include dining space, kitchen and hot press, servery, pantry, hall pantry, staff changing and social area, cleaner store, hall, WCs, storage, cloak room, entrance lobby, lobby, conference room, visitor room, day room, directors office, comms rooms, visitor WC, 1 no. ensuite student bedroom and 4 no. resident bed rooms and all circulation areas across the lower ground floor, upper ground floor and first floor levels (3 storeys). • The refurbishment of the existing annex building to include 9 no. ensuite student bedrooms at lower ground and ground floor level (2 storeys). • A new side extension (predominantly 2 storeys with 3 storey element to accommodate a new lift) linking the newly refurbished Gort Ard house and the Annex building to include 1 no. ensuite student bedroom, lounge, plant room, utility, drying press, accessible WC, washing/laundry area, ironing and laundry area, lobbies, lift and service riser at lower ground floor level. A new oratory at upper ground floor level to including sacristy, confessional box, lobbies, store, lift and service riser. • A new multipurpose building (2 storey) including 2 no. multipurpose rooms, shower facilities and toilets at lower ground floor level and 5 no. ensuite student bedrooms, lobbies and corridors at upper ground floor level. • A new link and extension between the newly refurbished annex building and new multipurpose building (2 storeys). • Primary vehicular access to Gord Ard is maintained via the existing main entrance to the site and revisions to the existing secondary service access are proposed to facilitate the new extension and associated new service arrangements for the building. • Bin Refuse Storage Areas and designated Bicycle Shelters providing for 20 secured and sheltered spaces plus 12 no. visitor bicycle spaces. • New external courtyard area with high quality hard and soft landscaping features. • All associated site development works including all landscaping and site service work at Gort Ard House, Rockbarton North, Salthill, Galway.

AuthorityGalway City Council
ReferenceFS10026
StatusChecked 17 Sep 2026
Open official record