~76 dwellings, Dunnstown, Co. Kildare.
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
No near-term procurement timing is inferred from a refused planning decision.
REFUSED / Confidence: High for planning stateDecision recorded 30 Jun 2021.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site...
Named firms
Public source roles
- Strategic Power Projects Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kildare County Council
- Exact reference
- 21608
- Evidence reviewed
- 27 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Large residential - 76 dwellings
The public application record identifies 76 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Strategic Power Projects Ltd
- Architect
- Brian Mackey - Malone O'regan
- Planning agent
- Peter Thomson Planning Solutions
- Agent address
- 4 Priory Grove Kells Co. Kilkenny.
More Kildare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site (proposed substation currently subject of a Strategic Infrastructure Development Pre-Application Consultation with An Bord Pleanála); and 4. all associated ancillary development works. The operational lifespan of the battery energy storage system will be 35 years. All
Application to site progress
-
Applied 6 May 2021 21608
-
Decision Refused 30 Jun 2021
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed This planning record has no linked public commencement evidence.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 21608
a 10 year planning permission for the construction of: 1. An enclosed battery energy storage system compound on c. 4.089 ha with 76 no. battery storage units (each with associated containerised step-up transformer), 1 no. containerised control room and 1 no. containerised switch room, 1 no. containerised switchgear unit and CCTV cameras; 2. new site entrance off the L6044 and site access road; 3. site access road extension to a proposed substation site (proposed substation currently subject of a Strategic Infrastructure Development Pre-Application Consultation with An Bord Pleanála); and 4. all associated ancillary development works. The operational lifespan of the battery energy storage system will be 35 years. All
Open official record