Infrastructure, Newbridge College, Newbridge, Co. Kildare
The development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 9 Jul 2025. / Confidence: LowDecision date 9 Jul 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Kildare County Council
- Exact reference
- 2560127
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Kildare planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends of the hockey pitch plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch plus the provision of dug outs/player shelters, a viewing area with 1.2m high & 0.6m high spectator rail and storage containers to serve the new pitch, • the construction of 1no. new synthetic/all-weather floodlit rugby pitch and all associated siteworks (in place of part of an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to eastern perimeter of pitch, 3m high perimeter fencing plus 12m high ball stop netting (total 15m overall) to western perimeter of pitch adjacent to River Liffey plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch to serve the new rugby pitch and also floodlights on the same lighting columns to light the existing grass pitch adjacent to the new all-weather rugby pitch plus the provision of dug outs/player shelters, a spectator viewing area with tiered steps with 1.2m high & 0.6m high spectator rail at pitch edge and storage containers to serve the new pitch, • the construction of a new path from the end of the existing private bridge over the River Liffey to the pitches to include 8no. new 5m high lighting columns with lighting and all associated siteworks to facilitate access to the new all-weather pitches, • together with all associated development siteworks related to the entire development. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2023-2029
Application to site progress
-
Applied 12 Feb 2025 2560127
-
Decision Conditional 9 Jul 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560127
The development will take place on the existing sports playing fields, adjacent to the River Liffey, to the east and opposite side to the existing Newbridge College buildings/campus and will consist of the following: construction of 1no. new synthetic/all-weather floodlit hockey pitch and all associated siteworks (to replace an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to both ends of the hockey pitch plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch plus the provision of dug outs/player shelters, a viewing area with 1.2m high & 0.6m high spectator rail and storage containers to serve the new pitch, • the construction of 1no. new synthetic/all-weather floodlit rugby pitch and all associated siteworks (in place of part of an existing grit surfaced hockey pitch) including new 3m high perimeter fencing to sides of pitch with 3m high perimeter fencing plus 3m high ball stop netting (total 6m overall) to eastern perimeter of pitch, 3m high perimeter fencing plus 12m high ball stop netting (total 15m overall) to western perimeter of pitch adjacent to River Liffey plus the provision of 6no. new 18.3m high lighting columns with floodlights around the new pitch to serve the new rugby pitch and also floodlights on the same lighting columns to light the existing grass pitch adjacent to the new all-weather rugby pitch plus the provision of dug outs/player shelters, a spectator viewing area with tiered steps with 1.2m high & 0.6m high spectator rail at pitch edge and storage containers to serve the new pitch, • the construction of a new path from the end of the existing private bridge over the River Liffey to the pitches to include 8no. new 5m high lighting columns with lighting and all associated siteworks to facilitate access to the new all-weather pitches, • together with all associated development siteworks related to the entire development. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2023-2029
Open official record