Save this project to account
Granted · decision due 23 Jul 2026Decision recorded

Public / civic, Scoil Mhuire Allenwood, Allenwood

Allenwood, Kildare · Kildare County Council · Plan 2660567 · PB ref PB-2861751761

The development will consist of demolition of both existing boiler house buildings, the construction of a two storey extension to the front school building with a total floor area of 994.8 m² comprising a 2 classroom SEN Unit, 3 no. en-suite classrooms, staff room, sanitary facilities, ancillary and service rooms, alterations...

Indicative value €500k–1m PB indicative band
Units applied for Not listed public application record
Floor area 995 m² published reliable figure
Decision due 23 Jul 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 21 Jul 2026. / Confidence: Low
Decision CONDITIONAL

Decision date 21 Jul 2026.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

The development will consist of demolition of both existing boiler house buildings, the construction of a two storey extension to the front school building with a total floor area of 994.8 m² comprising a 2 classroom SEN Unit, 3 no. en-suite classrooms, staff room, sanitary facilities, ancillary and service rooms, alterations to front school building to comprise the demolition an existing porch, the provision of a new roof light to existing kitchen, and other minor alterations to facilitate connection with...

Ref 2660567 Source-linked Official application description for exact planning reference 2660567

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Kildare County Council
Exact reference
2660567
Evidence reviewed
25 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

3 source-supported signals
Public / civic

Public / civic

The public application record identifies public / civic in the submitted planning scope.

2660567Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2660567Explicit description signal
Services

Services / drainage scope

The public application description explicitly references services / drainage scope.

2660567Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Board of Management Scoil Mhuire Allenwood
Planning agent
Caoimhe Merrick
Agent address
John P Delaney Architects Ltd Moorefield Road Newbridge, Co. Kildare W12P382
Official description

Application text

The development will consist of demolition of both existing boiler house buildings, the construction of a two storey extension to the front school building with a total floor area of 994.8 m² comprising a 2 classroom SEN Unit, 3 no. en-suite classrooms, staff room, sanitary facilities, ancillary and service rooms, alterations to front school building to comprise the demolition an existing porch, the provision of a new roof light to existing kitchen, and other minor alterations to facilitate connection with proposed extension alterations to rear school building to comprise the amalgamation of two smaller classrooms to create one larger classroom, and the reconfiguration of an existing kitchen to be repurposed as a plant room including minor changes to the elevation, 5) alterations to outdoor play areas comprising the provision of Secure SEN Play Area and Sensory Garden, the removal of existing “Astroturf” play area and replacement with new “astroturf” play area to the north of the site, and provision of new hard surface play areas to the west and south of the rear building, provision of new internal road including the construction of a new vehicular entrance from the church grounds, and the provision of set down area and 6 no. parking spaces to serve the SEN Unit, provision of 24 no. covered bicycle parking spaces, provision of new LPG gas compound and Heat Pump compound, installation of solar panels to proposed extension roof, all associated drainage & site development works.

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660567

The development will consist of demolition of both existing boiler house buildings, the construction of a two storey extension to the front school building with a total floor area of 994.8 m² comprising a 2 classroom SEN Unit, 3 no. en-suite classrooms, staff room, sanitary facilities, ancillary and service rooms, alterations to front school building to comprise the demolition an existing porch, the provision of a new roof light to existing kitchen, and other minor alterations to facilitate connection with proposed extension alterations to rear school building to comprise the amalgamation of two smaller classrooms to create one larger classroom, and the reconfiguration of an existing kitchen to be repurposed as a plant room including minor changes to the elevation, 5) alterations to outdoor play areas comprising the provision of Secure SEN Play Area and Sensory Garden, the removal of existing “Astroturf” play area and replacement with new “astroturf” play area to the north of the site, and provision of new hard surface play areas to the west and south of the rear building, provision of new internal road including the construction of a new vehicular entrance from the church grounds, and the provision of set down area and 6 no. parking spaces to serve the SEN Unit, provision of 24 no. covered bicycle parking spaces, provision of new LPG gas compound and Heat Pump compound, installation of solar panels to proposed extension roof, all associated drainage & site development works.

AuthorityKildare County Council
Reference2660567
StatusArchived record · no longer in the current lead feed
Open official record